Laserfiche WebLink
MATCHLINE - FOR CONTINUATION SEE SHEET P- 101 <br /> GENERAL NOTES <br /> II BACKGROUNDS SHOWN ARE SCHEMATIC AND NOT TO SCALE, <br /> BACKGROUNDS SHOW RELATIVE LOCATIONS OF EXISTING PIPING. <br /> O3" WASTE WATER i 2, ALL PIPE ROUTING SHOWN ARE SCHEMATIC AND DIMENSIONS ARE <br /> NOMINAL, .CONTRACTOR SHALL VERIFY ROUTING AND DIMENSIONS <br /> ' PRIOR TO FABRICATION. ANY CHANGES TO ROUTINGS SHOWN <br /> SHALL BE APPROVED BY OWNER. <br /> ( ' �--- (E) 2° WATER DRAW <br /> (E) ACCESS! HATCH % <br /> (REF) <br /> �N <br /> Pi$ KEYED NOTES <br /> 0 INSTALL NEW SUMP AND CONTACT WATER , PUMPS PRIOR TO <br /> REMOVAL orEXISTINGCONTACT WATER TANK AND ASSOCIATED <br /> PIPING, CONTRACTOR TO LOCATE NEVI SUMP TO AVOID <br /> 'd INTERFERENCE WITH EXISTING UNDERGROUND PIPING k UTILITIES, <br /> LOADINGRACK <br /> REMOVED PIPING, <br /> RACK i O INSTALL NEW PIPING ALONG SIMILAR ROUTE AS PREVIOUSLY <br /> Tn <br /> 5'-6 3/4" 2� STRIP <br /> 5 1/2" - ( // 3 INSTALL NEW, 2" WATER DRAW PIPING TO TP-02, <br /> I <br /> P 103 P XXX HOLD 4 FIDE:LBON EMI SIIOONSFILTTER�SYSTEM PROVIDED AND INSTALLED BY SC <br /> IIIIII LIT <br /> O2" VENT UP WITH 150# RF FLANGE FOR CONNECTION TO CARBON <br /> 025 025 o EMISSION FILTER SYSTEM, <br /> A � <br /> i <br /> I fl ACCES . — 5 <br /> I TP-03 <br /> P`02 <br /> 1 ° GRAIN <br /> HOLD j <br /> I <br /> 2" WATER — <br /> DRAW I 5 CARBON55 GAL CARE 55 N 4 ( 12' <br /> CANISTER CANISTER i - <br /> (N) PS _ I ROD THERMO PLASTIC PAD <br /> (N) PS (D,ETNL 1 ) i BOLTED TO STRUCTURAL <br /> (DETAIL 1 ) ! MEMBER (ALL SUPPORTS) <br /> 2" VENT I I (N) STRUCTURAL PAD, C8x8,2 <br /> ! SEE DWG 5- 100. 3" SCH 40 <br /> I I <br /> 14'- 1 57/64" 2'-G" 1 3'-0" - 2'-8" 1/4,.., <br /> — ° P , . I ° o <br /> III � I •• o .I . °. . . <br /> 4 <br /> (E) HAZARDOUS STORAGE —\ C ' ov: d <br /> PIPE SUPPORT <br /> DETAIL 1 <br /> SCALE: N,TS, <br /> _ �' QgOFESSl0,K9 <br /> ! (E) CURB ��� HO ct . <br /> o, fj <br /> M 3844fi., sy " <br /> ,fir <br /> I UTgOHANICP� P <br /> SOF CALIF <br /> I <br /> ENLARGED PLAN ISSUp FOR <br /> SCALE: 3/8" = 1 '-0" CON§TRUCTION <br /> IMP Our difference <br /> Is engineered, <br /> 0 1 '-4° 2'-8" 5'-4" vAAw.hanisgcoup.com <br /> IIIIIIIIIIIIP� <br /> f 4 6 9 <br /> PROJECT 110; OQ19658.00 <br /> TRANSPORTATION TERMINALS PIPING <br /> STOCKTON - SAN JOAQUIN COUNTY ENLARGED PIPING PLAN <br /> THIS DOCUMENT IS CONFIDENTIAL AND If SHALL NOT BE REPRODUCED OR <br /> REDISTRIBUTED WITHOUT PRIOR PERMISSION, NEITHER THE OPERATOR NOR THg OWNER <br /> 0 07/12/19 ISSUED FOR CONSTRUCTION — CONTACT WATER SYSTEM UG- 5 REMOVAL : HG DTH MANE ANY WARRANTY AS TO THE CORRECTNESS OR COMPLETENESS OF THE INFORMATION scAlE NOTED DATE : RcvtsnxJ <br /> REV ELEC 65ECH REV ELEC IAECH CONTAINED OL! THIS DRAWING, AND THE USER ASSUMES I�L.L- RISK OF LOSS TO P- IOO O <br /> DATE DESCRIPTION OF, REVISION ES NO, RY APP DATE DESCRIPTION OF REVISION ES NO. BY APP PERSONS AND PROPERTY AS A RESULT, OFR CE THEREON., fFtAVN Q, . TIELI D7 /12/19 <br />