Laserfiche WebLink
• <br /> MONITORING AND REPORTING PROGRAM <br /> STOCKTON COGENERATION COMPANY <br /> SAN JOAQUIN COUNTY <br /> 4. A narrative discussion of the analytical results for all media and locations monitored including <br /> spatial and temporal tends, with reference to summary data tables, graphs, and appended <br /> analytical reports (as applicable). <br /> 5. A comparison of monitoring data to the discharge specifications, groundwater limitations, and an <br /> explanation of any violation of those requirements. <br /> 6. Summary data tables of historical and current water table elevations and analytical results. <br /> 7. A scaled map showing relevant structures and features of the facility, the locations of monitoring <br /> wells and any other sampling stations, and groundwater elevation contours referenced to mean <br /> sea level datum. <br /> 8. Copies of laboratory analytical report(s) for groundwater. <br /> C. Annual Report <br /> By 30 January of each year, the Discharger shall submit a written report to the Executive Officer <br /> containing the following: <br /> a. The names and telephone numbers of persons to contact regarding the plant for emergency and <br /> routine situations. <br /> b. A statement certifying when the flow meter and other monitoring instruments and devices were <br /> last calibrated, including identification of who performed the calibration (Standard Provision <br /> C.6). <br /> The Discharger may also be requested to submit an annual report to the Board with both tabular and <br /> graphical summaries of the monitoring data obtained during the previous year. Any such request shall <br /> be made in writing. The report shall discuss the compliance record. If violations have occurred, the <br /> report shall also discuss the corrective actions taken and planned to bring the discharge into full <br /> compliance with the waste discharge requirements. <br /> All reports submitted in response to this Order shall comply with the signatory requirements of Standard <br /> Provision D.6. <br /> The Discharger shall implement the above monitoring program on the first day of the month following <br /> effective date of this Order. <br /> Ordered by: <br /> GARY M. CARLTON, Executive Officer <br /> REL (Date) <br />