Laserfiche WebLink
ATTACHMENT C <br /> ITEMS TO BE INCLUDED IN A <br /> MONITORING WELL INSTALLATION WORKPLAN AND A <br /> MONITORING WELL INSTALLATION REPORT OF RESULTS <br /> Prior to installation of groundwater monitoring wells, the Discharger shall submit a <br /> workplan containing the minimum listed information. Wells may be installed after staff <br /> approve the workplan. Upon installation of the monitoring wells, the Discharger shall <br /> submit a report of results, as described below. All workplans and reports must be signed <br /> by a registered geologist, certified engineering geologist, or civil engineer registered or <br /> certified by the State of California. <br /> Monitoring Well Installation Workplan <br /> A. General Information: <br /> Monitoring well locations and rationale <br /> Survey details <br /> Equipment decontamination procedures <br /> Health and safety plan <br /> Topographic map showing any existing monitoring wells, proposed wells, waste <br /> handling facilities, utilities, and other major physical and man-made features. <br /> B. Drilling Details: describe drilling and logging methods <br /> C. Monitoring Well Design: <br /> Casing diameter <br /> Borehole diameter <br /> Depth of surface seal <br /> Well construction materials <br /> Diagram of well construction <br /> Type of well cap <br /> Size of perforations and rationale <br /> Grain size of sand pack and rationale <br /> Thickness and position of bentonite seal and sand pack <br /> Depth of well, length and position of perforated interval <br /> D. Well Development: <br /> Method of development to be used <br /> Method of determining when development is complete <br /> Method of development water disposal <br /> E. Surveying Details: discuss how each well will be surveyed to a common reference <br /> point <br />