My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FAIRMONT
>
975
>
2300 - Underground Storage Tank Program
>
PR0231331
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2021 7:40:29 AM
Creation date
6/1/2020 11:51:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231331
PE
2351
FACILITY_ID
FA0000513
FACILITY_NAME
LODI MEMORIAL HOSPITAL
STREET_NUMBER
975
Direction
S
STREET_NAME
FAIRMONT
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
03107039
CURRENT_STATUS
01
SITE_LOCATION
975 S FAIRMONT AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Pressure Gauges in Psi/Nitrogen Equipment Resolution: 1/10-15 Psi <br /> Piping Run#1 Piping Run#2 Piping Run# Piping Run# <br /> Piping Material: Poly Plastic Poly Plastic <br /> Piping Manufacturer: APT APT <br /> Piping Diameter: 1 %2" 1 '/s" <br /> Length of Piping Run: Approx.32' Approx.32' <br /> Product Stored: Fuel Oil Fuel Oil <br /> Method and location of Test boot at Test boot at <br /> piping-run isolation: Piping Sump Piping Sum <br /> Wait time between applying 5 Minutes 5 Minutes <br /> pressure and starting test: <br /> Test Start Time: 9:20 9:20 <br /> Initial Reading(RI): 5.5 Psi 5.7 Psi <br /> Test End Time: 10:20 10:20 <br /> Final Reading(RF): 5.5 Psi 5.7 Psi <br /> Test Duration: 1 Hour 1 Hour <br /> Change in Reading(RF-Ri): 0 Psi 0 Psi <br /> Pass/Fail Threshold or No Loss in Psi No Loss in Psi <br /> Criteria: <br /> Test Result: Pass Pass <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> UST System for Emergency Generator. Suction Supply and Gravity Return. <br />
The URL can be used to link to this page
Your browser does not support the video tag.