My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VERA
>
1210
>
2900 - Site Mitigation Program
>
PR0505712
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2020 12:01:48 PM
Creation date
6/1/2020 12:00:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505712
PE
2965
FACILITY_ID
FA0000673
FACILITY_NAME
CITY OF RIPON
STREET_NUMBER
1210
Direction
S
STREET_NAME
VERA
STREET_TYPE
AVE
City
RIPON
Zip
95366
APN
25933004
CURRENT_STATUS
01
SITE_LOCATION
1210 S VERA AVE
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contents <br /> City of Ripon - Groundwater Monitoring Well Installation <br /> Workplan <br /> INTRODUCTION AND BACKGROUND................................................................................1-1 <br /> 1.1 Introduction................................................................................................. l I <br /> 1.2 Site Geology and Hydrogeology................................................................. 1-2 <br /> 1.2.1 Geology and Soils....................................................................................... 1-2 <br /> 1.2.2 Shallow Groundwater Occurrence.............................................................. 1-2 <br /> 1.2.3 Water Quality Regulatory Framework........................................................ 1-2 <br /> GROUNDWATERMONITORING WELL INSTALLATION...................................................2-1 <br /> 2.1 Monitoring Well Locations and Rationale..................................................2-1 <br /> 2.2 Equipment Decontamination Procedures....................................................2-1 <br /> 2.3 Health and Safety Plan................................................................................2-3 <br /> 2.3.1 Personal Protective Equipment...................................................................2-3 <br /> 2.3.2 Emergency Procedures................................................................................2-3 <br /> 2.4 Regulatory Permits......................................................................................2-3 <br /> 2.5 Monitoring Well Design.............................................................................2-3 <br /> 22.6 Well Development......................................................................................2-5 <br /> .7 Well Disinfection........................................................................................2-5 <br /> SURVEYINGAND SAMPLING............................................................................................3-1 <br /> 3.1 Surveying....................................................................................................3-1 <br /> 3.2 Soil Sampling..............................................................................................3-1 <br /> 3.3 Ground Water Sampling.......................................................... ...3-1 <br /> 3.3.1 Water Level Measurements ........................................................................3-1 <br /> 3.3.2 Purging......................................... ............................................................3-1 <br /> 3.4 Surface Water Monitoring ............. ............................................................3-2 <br /> 3.5 Groundwater Sample Collection...................... . <br /> 3.5.1 Quality Assurance/Quality Control.............................................................3-4 <br /> 3.5.2 Decontamination.............................................................................. 3-4 <br /> 3.5.3 Field Forms/Sample Identification.............................................................3-4 <br /> 3.5.4 Sample Shipment and Chain of Custody....................................................3-5 <br /> 3.6 Schedule......................................................................................................3-5 <br /> TABLES <br /> Table 1-1 Conservative Water Quality Goals................................................................. 1-3 <br /> Table 3-1 Groundwater and Surface Water Monitoring Program Summary <br /> (Field, Calculated, and Laboratory)...............................................................3-3 <br /> Table 3-2 Tentative Schedule of Well Completion(2007) ............................................3-5 <br /> April 2007 City of Ripon Wastewater Treatment Facility <br /> Groundwater Monitoring Well Installation Workplan <br />
The URL can be used to link to this page
Your browser does not support the video tag.