Laserfiche WebLink
APPENDIX <br /> SITE HEALTH AND SAFETY PLAN <br /> I. GENERAL INFORMATION <br /> Client: High Hopes Venture <br /> Project Number: NA <br /> Project Manager: Jim Vers put <br /> Health and Safety Officer: Jim Vers put <br /> Site Safety Officer: Jim Vers put <br /> i <br /> Health and Safety Plan Prepared by: Jim Vers put <br /> Issue Date: July 29, 1996 ' <br /> i <br /> Effective Period: 180 days <br /> II. SCOPE AND APPLICATION <br /> I <br /> The provisions of this Health and Safety Plan (HSP) are based upon an evaluation of <br /> known and/or suspected site contamination only, and are designed to minimize health and <br /> safety hazards of site activities as described in the- Scope of Work. If during the course <br /> of site work new chemical contamination is discovered, or additional site activities not <br /> described in the Scope of Work become necessary, all work shall stop pending an <br /> evaluation of the new information and appropriate modification of this Plan. The Health <br /> and Safety Officer shall direct this evaluation. <br /> i <br /> 1 <br />