My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VINE
>
1500
>
2900 - Site Mitigation Program
>
PR0506306
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2020 12:04:49 PM
Creation date
6/1/2020 12:03:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506306
PE
2951
FACILITY_ID
FA0007337
FACILITY_NAME
HI HOPES VENTURE*
STREET_NUMBER
1500
Direction
E
STREET_NAME
VINE
STREET_TYPE
ST
City
LODI
Zip
95242
CURRENT_STATUS
02
SITE_LOCATION
1500 E VINE ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
YY Z1 INC. <br /> August 2, 1996 <br /> Mr. Harlan Knoll <br /> San Joaquin County Public Health Services <br /> Environmental Health Division <br /> 304 East Weber Avenue <br /> Stockton, California 95201-0388 <br /> Re: Submission of Workplan for Vadose Zone Site Assessment and <br /> Interim Remedial Action for Hydrocarbon Contaminated Soil at <br /> Hi Hopes Venture, 9500 East Vine Street, Lodi, California <br /> Dear Mr. Knoll- <br /> Enclosed is a copy of the workplan to conduct a va ose zone site assessment and interim <br /> remedial action for hydrocarbon contaminated soil at the Hi Hopes Venture property <br /> located at 1500 East Vine Street, Lodi, California. The proposed work has been prepared <br /> in accordance with the recent change in cleanup strategy for hydrocarbon contaminated <br /> sites where a limited threat to groundwater is present. <br /> Hi Hopes is currently in the process of selecting a contractor to conduct the actual field <br /> work. This should be completed by August 27, 1996. Once final contractor selection has <br /> been made, your acceptance will be obtained and we will begin final plans for excavation <br /> operations. We would like to begin operations rot later than September 3, 1996 and if <br /> possible, sooner. <br /> If you have any questions regarding this workplan please do not hesitate to-contact me at <br /> (209) 369-9421 or Ms. Laura Bazeley at (805) 325-1112. Thank you very much. <br /> Sincerely, <br /> Stephen G. Muir <br /> Manager, Geotechnical Services <br /> SGM/er <br /> Enclosure <br /> 08220010.006 <br /> 4700 STOCKDALE HIGHWAY, SUITE 120 BAKERSFIELD,CALIFORNIA 93309 (805) 326-1112 FAX: (805) 326-0191 <br /> 4100 WESTHEIMER, SUITE 231 HOUSTON,TEXAS 7702 (713) 87-7-1149 FAX: (713) 877-1923 <br />
The URL can be used to link to this page
Your browser does not support the video tag.