My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VINE
>
1500
>
2900 - Site Mitigation Program
>
PR0506306
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2020 12:04:49 PM
Creation date
6/1/2020 12:03:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506306
PE
2951
FACILITY_ID
FA0007337
FACILITY_NAME
HI HOPES VENTURE*
STREET_NUMBER
1500
Direction
E
STREET_NAME
VINE
STREET_TYPE
ST
City
LODI
Zip
95242
CURRENT_STATUS
02
SITE_LOCATION
1500 E VINE ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE OF WORK <br /> FOR <br /> CONTRACTOR SERVICES FOR VADOSE ZONE <br /> SITE ASSESSMENT AND INTERIM 13EMEDIAL ACTION FOR <br /> HYDROCARBON CONTA INATED SOIL <br /> HI HOPES VENTURE <br /> 2120 WEST LODI AVENUE <br /> LODI, CALIFORNIA <br /> Gentlemen/Ladies: <br /> Hi Hopes Venture (Hi Hopes) has designed a Sc pe of Work for contractor services to <br /> complete a vadose zone site assessment and interim remedial action for hydrocarbon <br /> contaminated soil at its property located at 1500 East Vine Street, Lodi, California. Our <br /> project will consist of the following specific tasks: <br /> Task 1: Mobilization to site <br /> Task 2: Overexcavation of Hydrocarbon Contami ated Soil <br /> Task 3: Stockpiling of Hydrocarbon Contaminated Soil <br /> Task 4: Excavation Backfill <br /> Task 1: Mobilization to Site <br /> This task will include the mobilization of all necessary equipment to the job site. All <br /> equipment will be moved in for operations to start on or before September 3, 1996. <br /> Task 2: Overexcavation of Hydrocarbon Contaminated Soil <br /> This task will involve the overexcavation of a minimum of 1,000 cubic yards of <br /> hydrocarbon contaminated soil and/or clean soil. Contractor will provide an excavator <br /> capable of a reach of a minimum of 27 feet andshould have a minimum of a three cubic <br /> yard bucket. A front end loader with a minimum bucket size of 3 cubic yards will be <br /> required for the work. <br /> A main excavation with a sloping ramp that openr the excavation to the south will be <br /> advanced to a floor depth of approximately 20 fe t below ground surface. This <br /> excavation will be approximately 40 to 55 feet wi a and 50 to 60 feet long. Clean and <br /> contaminated soil will be segregated during the excavation phase. Contaminated soil <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.