My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008386
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VINE
>
1500
>
2900 - Site Mitigation Program
>
PR0506306
>
ARCHIVED REPORTS_XR0008386
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2020 12:09:55 PM
Creation date
6/1/2020 12:05:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008386
RECORD_ID
PR0506306
PE
2951
FACILITY_ID
FA0007337
FACILITY_NAME
HI HOPES VENTURE*
STREET_NUMBER
1500
Direction
E
STREET_NAME
VINE
STREET_TYPE
ST
City
LODI
Zip
95242
CURRENT_STATUS
02
SITE_LOCATION
1500 E VINE ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Q INC <br /> beneath the former Tank #1 site from soil samples collected from soil boring HH-SB1 to <br /> a depth of 46 5 feet below ground surface (soil gasoline concentrations appeared to be <br /> greatest at a depth of 16 5 to 36 5 feet below ground surface and attenuate to low <br /> concentrations at a depth of 46 5 feet below ground surface), (4) the soil contaminated by <br /> the gasoline leak from the Tank #1 appeared to be contained within a radius of <br /> approximately 40 feet from the former tank location because none of the other four soil <br /> borings encountered any gasoline contaminated soil, and (5) hydrocarbon constituents <br /> were not detected in soil boring HHV-B32 drilled at the former Tank#2 site <br /> 44 Exploratory Excavation and Removal of Hydrocarbon Impacted Soil <br /> WZI recommended to Hi Hopes Venture to complete the soil site assessment investigation <br /> by over excavation of the hydrocarbon impacted soil beneath the tank location The <br /> overexcavtion of the hydrocarbon impacted soil was designed to accomplish the following <br /> 1 Determine if gasoline fuel components were present in the soil that would <br /> require site assessment/remedial operations <br /> 2 Determine the vertical and horizontal extent of the gasoline impacted soil <br /> 3 Remove hydrocarbon impacted soil to the extent feasible <br /> WZI submitted a workplan to conduct a vadose zone site assessment and interim remedial <br /> action for hydrocarbon impacted soil to PHSEHD during August, 1996 This workplan <br /> was approved by Mr Harlan Knoll on August 29, 1996 Jim Thorpe Oil Company, Inc <br /> (Thorpe) was selected to provide onsite contractor services Thorpe is a State of <br /> California Contractor#495699 with a General Engineering rating Thorpe also has a <br /> 08220010 011 28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.