Laserfiche WebLink
WZ1 1NC <br /> Level D PPE <br /> Tyvek coveralls, hard hat, steel toed, steel shank work boots, safety glasses, work gloves PPE <br /> required for each fob task depends on the chemical and physical hazards expected of that task, <br /> as described above The following PPE ensembles are assigned to project tasks <br /> Task Assigned PPE Ensemble <br /> I <br /> 1 Site Background Investigation NA <br /> 2 Exploratory Trenching Level D <br /> 3 Laboratory Analysis NA <br /> 4 Report Preparation NA <br /> B Site Control <br /> sInitial Site Entry <br /> I <br /> The Project Manager shall arrange an initial site briefing with the Health and Safety Officer <br /> (HSO) Based on the information provided in this initial site briefing and on the nature of <br /> magnitude of known or suspected site contaminants and the work plan tasks, the HSO shall <br /> determine initial site entry procedures and shall specify them below It is the responsibility of <br /> the Site Safety Officer (SSO) to implement these procedures and direct proper site entry <br /> Personal Protective Equipment (PPE) ensemble for personnel to wear during initial site entry <br /> I <br /> Level D with respirator available Respirator shall be half mask with organic vapor cartridges <br /> (color-coded black and gray) <br /> • <br /> 08220010 011 APPENDIX 1 <br /> 8 <br />