My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008386
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VINE
>
1500
>
2900 - Site Mitigation Program
>
PR0506306
>
ARCHIVED REPORTS_XR0008386
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2020 12:09:55 PM
Creation date
6/1/2020 12:05:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008386
RECORD_ID
PR0506306
PE
2951
FACILITY_ID
FA0007337
FACILITY_NAME
HI HOPES VENTURE*
STREET_NUMBER
1500
Direction
E
STREET_NAME
VINE
STREET_TYPE
ST
City
LODI
Zip
95242
CURRENT_STATUS
02
SITE_LOCATION
1500 E VINE ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
■VZ1 iNC <br /> Exclusion Zone or "Hot" Zone <br /> The Exclusion Zone or "Hot" Zone shall be defined as follows <br /> 1 Wherever portable direct-reading air monitoring instruments register anything <br /> above the background readings established upwind off-site in uncontaminated <br /> areas <br /> 2 If portable direct-reading air monitoring instruments read background throughout <br /> the site, the exclusion zone shall be defined around the area(s) of known or <br /> suspected chemical contamination, or where drilling, excavation, soil sampling, <br /> or other invasive activity is to be performed <br /> Decontamination Zones <br /> The SSO shall establish a decontamination corridor adjacent to and upwind from identified <br /> exclusion zones The SSO shall set up both equipment and personnel decontamination areas <br /> outlined under "Decontamination Procedures" below <br /> Support Zone <br /> The SSO shall establish support zones upwind from the decontamination corridor where all <br /> portable direct-reading air monitoring instruments read background, at a distance of at least 20 <br /> meters from the exclusion zone <br /> i <br /> The support zone shall be established such that support personnel may observe all personnel <br /> in the exclusion zone at all times <br /> r� 082200/0 011 APPENDIX I <br /> 10 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.