Laserfiche WebLink
' 4NC <br /> APPENDIX I <br /> ' SITE HEALTH AND SAFETY PLAN <br /> 1 <br /> 1. GENERAL INFORMATION <br /> Client: Hi Hopes Venture <br /> ' Project Number 0822 0010 <br /> Project Manager Stephen G Muir <br /> ' Health and Safety Officer* Bob Blalock <br /> Site Safety Officer- Stephen G Muir <br /> ' Health and Safety Plan Prepared by. Stephen G Muir <br /> ' Issue Date August 19, 1996 <br /> Effective Period 180 days <br /> 11 SCOPE AND APPLICATION <br /> The provisions of this Health and Safety Plan (HSP) are based upon an evaluation of known <br /> ' and/or suspected site contamination only, and are designed to minimize health and safety <br /> hazards of site activities as described in the Scope of Work If during the course of site <br /> ' work new chemical contamination is discovered, or additional site activities not described <br /> in the Scope of Work become necessary, all work shall stop pending an evaluation of the <br /> ' new information and appropriate modification of this Plan The Health and Safety Officer <br /> shall direct this evaluation <br /> 1 <br /> 1 <br /> APPENDIX <br /> 1 <br /> ' 08220010 005 <br />