Laserfiche WebLink
' %VZ1 INC <br /> ' Pro ect Personnel <br /> tTraining (40 Hour, 3 Day Site Specific, 8 Hour Refresher) <br /> Respirator Fit Tested and Trained <br /> ' Air Monitoring Instrument Calibration <br /> 1 <br /> 1 � <br /> 1 <br /> r( 1, APPENDIX 1 <br /> 3 <br /> 08220010 005 <br /> 1500 East Vine Street, Lodi, California Former t <br /> Underground Storage Tank h <br /> g g at contained <br /> gasoline fuel <br /> Topographic Map Attached yes X no Attached to Work Plan <br /> Location Map Attached yes X no Attached to Work Plan <br /> V. WORK PLAN <br /> Objectives <br /> Exploratory excavation of gasoline fuel contaminated soil undemeath and adjacent to a <br /> former underground storage tank <br /> Tasks <br /> 2 Exploratory Trenching and Removal of Hydrocarbon Contaminated Soil <br /> ' APPENDIX 1 <br /> 4 <br /> 08220010 005 <br />