My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008387
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VINE
>
1500
>
2900 - Site Mitigation Program
>
PR0506306
>
ARCHIVED REPORTS_XR0008387
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2020 12:09:15 PM
Creation date
6/1/2020 12:05:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008387
RECORD_ID
PR0506306
PE
2951
FACILITY_ID
FA0007337
FACILITY_NAME
HI HOPES VENTURE*
STREET_NUMBER
1500
Direction
E
STREET_NAME
VINE
STREET_TYPE
ST
City
LODI
Zip
95242
CURRENT_STATUS
02
SITE_LOCATION
1500 E VINE ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 1 INC <br /> If Level C PPE is required for initial site entry, then all personnel MUST cavy a 5 minute escape <br /> ' air bottle <br /> ' Initial Site Entry Procedures <br /> Level D PPE and as outlined below Air monitoring with portable photoionization detector <br /> (0 VM) <br /> I 1 <br /> Prior to entering the site, the SSO shall calibrate the portable direct-reading air monitoring <br /> ' instruments upwind from site in an uncontaminated area <br /> The SSO shall then determine background readings for all air monitoring Instruments in this <br /> same upwind, off-site, uncontaminated area <br /> The SSO shall record the instrument calibration procedures and results and all background <br /> readings in the Site Safety Log Book <br /> ' All personnel must enter the site from an upwind position if possible <br /> ' C Work Zones <br /> ' At the beginning of each work shift the WZI SSO shall perform initial air monitoring with <br /> portable direct-reading Instruments to identify the area(s) onsite where gas and vapor <br /> contamination is present <br /> ' Based on these initial air monitoringreadings, the SSO shall establish discrete 9 , t work zones as <br /> ' follows <br /> APPENDIX I <br /> • 9 <br /> ' 08220010 005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.