Laserfiche WebLink
INC <br /> E. Site Safe Work Practices <br /> ' 9 Dally Safety Meeting <br /> ' 2 Onsite Health and Safety Monitoring <br /> 3 All trenches shall be sloped at or beyond the angle of repose <br /> F. Trenching and Excavation Safety Procedures <br /> See WZI Protocol <br /> G Decontamination <br /> ' Personnel <br /> Personnel will wear Tyvek garments and gloves These will be disposed of onsite <br /> ' Equipment <br /> 1 Wash down onsite and rinse with clean water <br /> ' H Procedures for Disposal of Wastes and Derived Materials <br /> 1 1 All waste water and soil will be placed on contaminated soil pile and covered <br /> . APPENDIX 1 <br /> ' 16 <br /> 08220010 005 <br />