Laserfiche WebLink
• <br /> Mr. Michael T. Goldstein <br /> October 18 , 1985 <br /> Page 4 <br /> The calibrated model indicates that initially 14 pounds of chloroform <br /> leaked from the storm water basin into the shallow groundwater <br /> zones . The leak occurred between July 28 and July 29 , 1984 , during <br /> the hyperchlorination of the basin. Chloroform concentrations in <br /> monitoring wells BC2, BC3 , BC4 , and BC5 measured on October 9 , 1984 ; <br /> BC10 on April 28 , 1985, and concentrations in BC12 and BC14 <br /> September 9 , 1985 , were used to fix the amount of the initial leak. <br /> The low concentration in BC2 , BC3 , BC4 , and BC5 on December 7 , 1984 , <br /> and the low concentration in BC6 and BC7 on December 27 , 1984 , <br /> indicate there was no significant leakage in the period from the <br /> initial leak to the start of sludge removal . <br /> Excavation of sludge from the basin, which began in early 1985 , <br /> caused intermittant infiltration of water through chloroform <br /> containing soils. This allowed another 15 pounds of chloroform to <br /> enter the shallow aquifer before April 20 , 1985; 13 pounds of this <br /> chloroform entered on January 12 , 1985. Chloroform concentrations in <br /> BC2 , BC3 , BC4 , BC5 , and BC7 on January 31 , 1985 , in conjunction with <br /> field observations fix the time. Concentration in BC-10 on February <br /> 28 , 1985 , and March 11 , 1985 ; and BC-12 on September 9 , 1985 , <br /> September 16 , 1985 , September 23 , 1985 , and October 7 , 1985 fix the <br /> amount. Another pound of chloroform was introduced into the aquifer <br /> on February 15 , 1985 , and the other pound infiltrated over the entire <br /> 3 month period. Concentrations in BC7 and BC11 on February 28 , 1985 , <br /> RWl on May 2 , 1985 , and RW1 and BC7 on June 24 , 1985 , fix the time <br /> and the amount. <br /> Simulation <br /> Analysis of simulations demonstrated chloroform that leaked into the <br /> aquifer after April 20 , 1985, was recovered by the recovery system <br /> initiated on July 1 , 1985 . The simulations showed 96 pounds of <br /> chloroform entered the aquifer between April 20 , 1985, and October <br /> 15 , 1985 . The simulations also demonstrated the recovery well system <br /> has removed approximately 95 pounds of chloroform as of October 15 , <br /> 1985. The water pumped from R111 has been intermittantly discharged <br /> into the excavated basin introducing variable amounts of chloroform <br /> into the aquifer. This has also leached chloroform out of sediments <br /> under the basin and the aquifer. The effectiveness of the recovery <br /> system has been confirmed by the decreasing chloroform concentrations <br /> in the wells around the basin after September 20 , 1985. <br /> Extent of Plume <br /> The extent of the chlorform plume on September 3 , 1985 , is shown on <br /> Figure 1 ; and the predicted extent of the plume on January 2 , 1985 , <br /> is shown on Figure 2. The furthest extent of the 50 ppb <br /> concentration contour was within 700 feet of the basin on September <br /> 3 , 1985 , and will only be 900 feet away from the basin on January 12 , <br /> 1985. The high chloroform concentratons in the vicinity of the basin <br /> and RW1 , shown on Figure 1 , are the result of discharging water from <br /> RW1 to the basin. The concentrations in this vicinity are <br /> BROWN AND CALDWELL <br /> Pu 14"M11 I'. WM NI II l 111 l F lA 'A'.16 1^:U 01!19V�90111 It Ilk 1'61.1110. UI I II'I AI Y411111111.Mlle AV[N111 PI I A'.ANI 11111 '1.1',..'5 <br />