Laserfiche WebLink
1 <br /> x <br /> 4' �rrr <br /> r. <br /> My H <br /> 25 August 2011, AS-4. View to the north from behind Consolidated Container <br /> Company's building. Sonic drill platform and support vehicles. The inner diameter of <br /> the sonic drill pipe was slightly larger than the outer diameter of the grout seal. This <br /> ' enabled the drill pipe to utilize approximately 55 feet of grout seal as a guide to achieve <br /> total depths ranging from 63-73 feet bgs. <br /> 1 <br /> - <br /> V <br /> 25 August 2011,AS-4. View to the north from behind Consolidated Container <br /> ' Company's building. The rail spur was an active line servicing the facility. AS-1 and <br /> AS-3 were installed between the two rail lines. Coordination was made with the <br /> ' facility's production manager prior to the destruction of the wells. <br />