Laserfiche WebLink
Ms Julie Raining <br /> • - 2-- 13 August 2002 <br /> Georgia-Pacific Corporation <br /> multiple or continuous previous on-site releases from chlorine storage, transport or use areas. The <br /> largest of release however appears to have resulted from the deliberate, one time application of <br /> chlorine at the groundwater basin. We concur that upgradient detections in MW-21 warrant a delay <br /> in performing remedial activities in order to further characterize the lateral extent of chloroform. By <br /> 16 September 2002,please submit a Workplan for additional characterization. <br /> You may reach me at(916 2 -3411 or at tavlorbarh5s.swrcb.ca.aov with any questions. <br /> Brian Taylor <br /> Associate Engineering Geologist <br /> cc: Mr. Michael Infura, San Jaoquin County Department of Environmental Health, Stockton <br /> Mr. Robert L. Hammond, Acton Mickelson Environmental,Inc., El Dorado Hills <br />