Laserfiche WebLink
WORK PLAN FOR ADDITIONAL SOURCE AREA ASSESSMENT <br /> Fortner Georgia-Pacific Corporation Tracy Chemical Packaging Plant <br /> ' 75 West Valpico Road,Tracy,California <br /> AME Project No. 16014.01 _4_ <br /> ' 4.0 SCHEDULE <br /> ' Field activities will start within two weeks following RWQCB approval of this Work Plan. A <br /> report documenting the results of the investigation will be submitted within 90 days of <br /> commencement of field activities. <br /> 5.0 REMAEKS <br /> 1 <br /> This report represents our professional opinions, which are based in part on information supplied <br /> ' by the client. These opinions are based on currently available information and have been arrived <br /> at in accordance with currently accepted hydrogeologic and engineering practices at this time <br /> and location. Other than this, no warranty is implied or intended. Any reliance on the <br /> ' information contained herein by third parties is at such party's sole risk. <br /> ' 6.0 REFERENCES <br /> ' Brown and Caldwell, 1985. Interim Report Geohydrologic Investigation. <br /> 1 <br /> 1 <br /> 82001-032.doc <br /> 1 <br />