My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VALPICO
>
75
>
2900 - Site Mitigation Program
>
PR0506509
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2020 12:26:14 PM
Creation date
6/1/2020 12:12:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0506509
PE
2960
FACILITY_ID
FA0007466
FACILITY_NAME
GEORGIA PACIFIC CORP (FORMER)
STREET_NUMBER
75
Direction
W
STREET_NAME
VALPICO
STREET_TYPE
RD
City
TRACY
Zip
95336
APN
24613007
CURRENT_STATUS
01
SITE_LOCATION
75 W VALPICO RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
552
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Gerald Djuth, C.E.G., P.E. <br /> May 25, 2011 <br /> Page 3 of 3 <br /> WASTE DISPOSAL, INVESTIGATION•DERIVED WASTE <br /> Decontamination water and wastewater used in destruction methods will be stored onsite in <br /> 55-gallon drums, then transported and disposed of at a State of California certified wastewater <br /> disposal facility. <br /> Standpipes, well casings, annular material, and cuttings from over drilling will be containerized <br /> onsite and sampled for waste profiling purposes. The waste will then be transported and disposed <br /> of at a State of California certified disposal facility. <br /> SCHEDULE <br /> Field work is anticipated to be completed within 6 weeks following RWQCB and San Joaquin <br /> County approval of this Work Plan. Preparatory tasks such as execution of agreements with <br /> subcontractors and subcontractor safety training will commence during the review period to <br /> expedite the completion of proposed work. <br /> Please contact Ms. Julie Raming of G-P at (404) 652-6869 or Barbara Mickelson of AME at <br /> (916) 939-7554 or bmickelson@ameinc.net if you have any questions. <br /> ACTON• MICKELSON •ENVIRONMENTAL,INC. <br /> � � ���� <br /> Acalifornia <br /> ohn D. Mattey, P.G. E.G. Barbara Micllson, P.E. <br /> Professional Geologist#3832 California Professional Engineer#43417 <br /> California Certified Engineering Geologist#1236 <br /> Enclosures <br /> cc: Ms. Julie Raming, Georgia-Pacific, LLC <br /> Mr. Michael Infurna, San Joaquin County <br /> �joNAL GEO40 <br /> iD. MA Cider <br /> </3�/�FL <br /> No. <br /> 1236 <br /> CERTIFIED <br /> * EGEOLOCIST �Q t <br /> e / <br /> 6>4 <br /> ©2011. Georgia-Pacific LLC. All rights reserved. <br /> AME <br /> a,cm...aearansa.mn. U12011 Letters and Reports\16014.01\Work Plans\Well Desttuction\Work Plan.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.