My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VALPICO
>
75
>
2900 - Site Mitigation Program
>
PR0506509
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2020 12:26:14 PM
Creation date
6/1/2020 12:12:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0506509
PE
2960
FACILITY_ID
FA0007466
FACILITY_NAME
GEORGIA PACIFIC CORP (FORMER)
STREET_NUMBER
75
Direction
W
STREET_NAME
VALPICO
STREET_TYPE
RD
City
TRACY
Zip
95336
APN
24613007
CURRENT_STATUS
01
SITE_LOCATION
75 W VALPICO RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
552
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 1 ' <br /> MONITORING WELL CONSTRUCTION DETAILS <br /> Former Georgia-Pacific,LLC Chemical Packaging Facility <br /> 75 West Valpico Road,Tracy,California , <br /> Casing Screened Hydro- Casing <br /> Elevation Interval Total Depth stratigraphic Diameter Comments ' <br /> Well ID Install Dat ft msl ft b gs ft b s 2 Uni[ 0.75 <br /> AS-1 10/7/03 <br /> AS-2 10/6/03 <br /> AS-3 10/7/03 - <br /> AS-4 10/6/03 - 62.5-65.0 68.5 2 0.75 <br /> AS-5 10/2/03 - 67.5-70.0 73.0 2 0.75 <br /> AS-6 10/2/03 - 61.5-64.0 67.5 2 0.75 <br /> AS-7 10/8/03 62.5-65.0 67.0 <br /> AS-8 10/3/03 62.5-65.0 68.2 2 0.75 <br /> AS_9 10/3/03 - 61.5-64.0 67.0 2 0.75 <br /> AS-10 10/8/03 <br /> AS-11 9/30/03 - 64.5-67.0 68.5 2 0.75 <br /> 59.5-62.0 70.0 2 0.75 <br /> AS-12 10/1/03 - 1 2 Destro ed b EHD Permit 5/8/02 <br /> BC-1 10/5/84 - 9.5-19.5 28.5 T icall <br /> 10/5/84 98.85 19.0-39.0 46.5 1 2 ' <br /> BC-2 2 T dry <br /> icall dry <br /> BC-3 10/8/84 101.43 19.5-39.5 41.5 i 2 T icall <br /> BC-4 10/8/84 100.37 19.5-39.5 41.5 2 T icall d <br /> dm <br /> BC-5 10/8/84 100.88 19.5-39.5 41.5 1 2 I <br /> BC-6 12/27/84 106.59 29.5-50.0 51.5 2 2 <br /> BC-7 12/21/84 97.38 55.0-70.0 70.0 22 Des ed b EHD Permit 3/22/91 <br /> BC-8 2/13/85 - 20.5-40.5 41.0 1 T icall d <br /> 1/12/85 97.59 20.5-40.5 41.0 1 2 I <br /> BC-9 2 2 <br /> BC-10 2/13/85 97.75 54.5-69.5 70.0 2 Destro ed bv EHD Permit 6/5/01 <br /> BC-11 2/13/85 - 23.9-42.5 70.0 1 2 BC-1l relacement <br /> BC-11A 6/5/01 97.99 37.0-49.0 50.5 1 2 Destro ed b EHD Permit 5/8/02 I <br /> BC-12 8/28/85 - 31.5-41.5 68.0 <br /> 6685.5 2 <br /> 2 <br /> BC-13 8/31/85 94.15 75.0- .0 88.0 3 2 <br /> 44.0-64.0 65.0 2 <br /> BC-14 9/5/8591 33.2-53.2 64.0 12 2 I <br /> BC_15 3/25/86 92.34 2 <br /> BC-16 3/26/86 92.08 44.0-65.0 67.0 2 4 <br /> BC-17 3/21/86 94.01 84.0-94.0 95.0 4 4 <br /> BC-18 2/6/97 99.48 29.0-54.5 56.0 1 2 4 <br /> BC-19 2/5/97 98.78 30.5-55.5 56.0 1 2 <br /> BC-20 2/4/97 89.53 25.0-50.0 50.0 27 Z <br /> MW-21 5/17/02 99.10 49.0-5 9.0 60.0 2 2 <br /> M 5/19/03 1 98.53 43-33 60.0 2 1 <br /> 2 <br /> MW-23 5/19/03 102.24 53-63 63.25 2 <br /> 56.7-75.5 80.0 2 3 8 Destro ed b EHD Permit 7/5/01 <br /> RW-I 5/1/85 - 2 g Inactive since 9/91 <br /> RW-2 11/23/89 40.0-60.0 82.0 <br /> N_res <br /> bgs=below groundsurface Jt=feet in=inches msl=mean sea level <br /> EHD=Son Joaquin County Environmental Health Department <br /> ®2011.Georgia-Pacific LLC.All rights reserved. <br /> U:\2011 Letters and Reports\16014.0Mork Plans\ <br /> Page I of 1 Revised Well Destruction\Tables\Table l.xls <br /> 6/13/2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.