My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VIA NICOLO
>
17950
>
2900 - Site Mitigation Program
>
PR0516772
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2020 12:40:03 PM
Creation date
6/1/2020 12:21:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0516772
PE
2965
FACILITY_ID
FA0012793
FACILITY_NAME
MUSCO OLIVE LAND APP/TITLE 27
STREET_NUMBER
17950
Direction
W
STREET_NAME
VIA NICOLO
STREET_TYPE
RD
City
TRACY
Zip
95377
APN
20911032
CURRENT_STATUS
01
SITE_LOCATION
17950 W VIA NICOLO RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
247
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Page 1 of 1 <br /> Mike Infurna [EH] <br /> From: Dennis Leikam [dennisl@olives.com] <br /> Sent: Wednesday, June 18, 2008 7:07 AM <br /> To: Mike Infurna [EH] <br /> Subject: Musco Drilling Update 6-17-08 <br /> Hi Mike - Here are spec's for wells WC-3 and PDW-1(S). Also, approximately 200-feet due west of <br /> PDW-1(S)we advanced to 20 feet before I realized we may not be in the right position for the borehole, <br /> so it was grouted to surface and abandoned. The hole was re-started 200 feet east, as PDW-1(S). I <br /> attached a map that shows the location of the wells and abandoned borehole (sorry about that). Here <br /> are the spec's: <br /> 20-foot boring - <br /> Terminated at 20-feet. Grouted to surface using 6 bags of Type 1/11 Portland cement. <br /> WC-3 - <br /> Total boring depth = 44.5 feet <br /> Screen - 0.010" SCH 40, from 28-43' <br /> Sand -#2/12 Clean Sand, from 26-44.5' (6 X 100 lbs bags) <br /> Transition Seal - 3/8" Bentonite chips, from 24-26' (1 - 50 Ib bag) <br /> Grout- 8 bags of 94 Ib Type 1/II Portland Cement <br /> 7.5 gallons water used for hydration of transition seal, allowed 35 minutes of hydration time. <br /> PDW-1(S) <br /> Total boring depth = 52 feet <br /> Backfill - 1/4" bentonite pellets, TR30 (14 buckets) <br /> Screen - 0.010" SCH 40, from 8-23 <br /> Sand -#2/12 Clean Sand, from 7-24' (6 X 100 lbs bags) <br /> Transition Seal - 3/8" Bentonite chips, from 6-7' (1 - 50 Ib bag) <br /> Grout - 3 bags of 94 Ib Type 1/11 Portland Cement <br /> As for future drilling, we are done for this week, but Frank might be back out on Monday to start the <br /> PDW-1 (shooting for deep GW) with mud rotary. The well above, PDW-1(S) is installed in a shallow <br /> zone that is not the original target zone, but everybody agreed that they would like a well in first <br /> encountered GW in addition to the deeper zone. I will keep you posted, but even if Frank does come <br /> out Monday, it will be at least a few days before he's ready to grout a conductor casing. <br /> Thanks, give me a call or shoot me an email if you have any questions. <br /> Dennis <br /> 6/18/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.