Laserfiche WebLink
Oct-26-06 04: 54P P.02 <br /> ATTN: :dike Infurna <br /> San Joaquin County Inspector <br /> Hi Mike, <br /> Here are the schematics for the three wells that were developed today (MNY-19, MW-20, <br /> and MW-2 1). Call me i f you have any questions or comments. <br /> Kelly Hagman <br /> Musco Family Olive Co. <br /> 17950 Via Nicolo <br /> Tracy, California 95376 <br /> (209)640-2964 (cell) <br /> (209)836 4678 ext 371 <br /> (209)836-0853 (fax) <br /> Kell h olives.corn <br /> MW-19: <br /> Total depth: fig' bgs <br /> Dia, of boring: 8" <br /> Dia. of casing: 2" (Schedule 40 PVC) <br /> Screen Interval: (19'- 49' bgs <br /> Slot size: 0.010 <br /> Sand Interval: fig' 47' bgs <br /> Sand Size, tf2l12 <br /> #of bags of sand used: 8 (100 Ib. bags) <br /> Bentonite Interval: 47' —44' <br /> Type of Bentonite: 3/8" Bentonite chips <br /> # of Bentonite Bags used: 1 'h <br /> # of hydrations: 2 <br /> C7allons ofwater added for hydration: 7.5 gals <br /> Total time for hydrations: 25 mins(added 5 gal Ions, waited 15 mins; added another 2 <br /> /, gals, waited another 10 mins). Bentonite sual was fully developed. <br /> Grouted with cement to the top. <br /> Type of Monument; 5' stovepipe. Installed to a 3 foot height above ground surface, 2 <br /> feet below. <br /> PVC height ags: 3' <br /> 3 crash posts (4"x 5' steel SCH 40 ) installed. <br /> MW-20: <br /> Total depth, 65' bgs <br /> Diu. of boring: 9" <br /> Dia. of casing: 2" (Schedule 40 PVC.) <br /> Screen Interval: 65'- 45' bgs <br />