My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VIA NICOLO
>
17950
>
2900 - Site Mitigation Program
>
PR0516772
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2020 12:40:03 PM
Creation date
6/1/2020 12:21:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0516772
PE
2965
FACILITY_ID
FA0012793
FACILITY_NAME
MUSCO OLIVE LAND APP/TITLE 27
STREET_NUMBER
17950
Direction
W
STREET_NAME
VIA NICOLO
STREET_TYPE
RD
City
TRACY
Zip
95377
APN
20911032
CURRENT_STATUS
01
SITE_LOCATION
17950 W VIA NICOLO RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
247
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Oct-26-06 04: 54P P.02 <br /> ATTN: :dike Infurna <br /> San Joaquin County Inspector <br /> Hi Mike, <br /> Here are the schematics for the three wells that were developed today (MNY-19, MW-20, <br /> and MW-2 1). Call me i f you have any questions or comments. <br /> Kelly Hagman <br /> Musco Family Olive Co. <br /> 17950 Via Nicolo <br /> Tracy, California 95376 <br /> (209)640-2964 (cell) <br /> (209)836 4678 ext 371 <br /> (209)836-0853 (fax) <br /> Kell h olives.corn <br /> MW-19: <br /> Total depth: fig' bgs <br /> Dia, of boring: 8" <br /> Dia. of casing: 2" (Schedule 40 PVC) <br /> Screen Interval: (19'- 49' bgs <br /> Slot size: 0.010 <br /> Sand Interval: fig' 47' bgs <br /> Sand Size, tf2l12 <br /> #of bags of sand used: 8 (100 Ib. bags) <br /> Bentonite Interval: 47' —44' <br /> Type of Bentonite: 3/8" Bentonite chips <br /> # of Bentonite Bags used: 1 'h <br /> # of hydrations: 2 <br /> C7allons ofwater added for hydration: 7.5 gals <br /> Total time for hydrations: 25 mins(added 5 gal Ions, waited 15 mins; added another 2 <br /> /, gals, waited another 10 mins). Bentonite sual was fully developed. <br /> Grouted with cement to the top. <br /> Type of Monument; 5' stovepipe. Installed to a 3 foot height above ground surface, 2 <br /> feet below. <br /> PVC height ags: 3' <br /> 3 crash posts (4"x 5' steel SCH 40 ) installed. <br /> MW-20: <br /> Total depth, 65' bgs <br /> Diu. of boring: 9" <br /> Dia. of casing: 2" (Schedule 40 PVC.) <br /> Screen Interval: 65'- 45' bgs <br />
The URL can be used to link to this page
Your browser does not support the video tag.