My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VIA NICOLO
>
17950
>
2900 - Site Mitigation Program
>
PR0516772
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2020 12:44:39 PM
Creation date
6/1/2020 12:23:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0516772
PE
2965
FACILITY_ID
FA0012793
FACILITY_NAME
MUSCO OLIVE LAND APP/TITLE 27
STREET_NUMBER
17950
Direction
W
STREET_NAME
VIA NICOLO
STREET_TYPE
RD
City
TRACY
Zip
95377
APN
20911032
CURRENT_STATUS
01
SITE_LOCATION
17950 W VIA NICOLO RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
893
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Musco Family Olive Compar* - 3 - 21 March 2007 <br /> Staff requests Musco submit a report with the rationale for well locations designated as C(R3), <br /> D(R3), and E(R3) and identify the geologic horizon(s) the wells are intended to monitor. The <br /> report should also provide the results of borings B-1 through B-3 and an interpretation of those <br /> results. The report is due by 10 April 2007. <br /> According to the work plan schedule, Musco proposes to proceed with well installation in May <br /> 2007, if normal or below normal rainfall has occurred during the 2006/2007 wet season. <br /> Based on current precipitation data from the Department of Water Resources, the 2006/2007 <br /> wet season for the Tracy area appears to be below normal precipitation and therefore staff <br /> anticipate that the nine Phase I wells will be installed during May 2007. Staff understands that <br /> permission to access neighboring properties is required for well installation and that Musco is <br /> progressing with the access agreements. Once drilling of the Phase I borings has been <br /> completed, a well installation report shall be submitted within 60 days of completion. The well <br /> installation report must be prepared in accordance with the attached report guidelines. <br /> The proposed Phase I drilling is critical to further characterize groundwater conditions at the <br /> site. However, additional off-site investigation has been recommended to define and <br /> characterize off-site impacts. Following evaluation of groundwater sampling data collected <br /> through November 2007, and submission of the Water Quality Protection Standard by <br /> 1 December 2007, the Discharger shall submit the Phase II work plan by 31 January 2008. <br /> If you have any questions please call me at (916) 464-4737. <br /> Todd A. Del Frate <br /> Engineering Geologist <br /> Waste Discharge to Land Unit <br /> Lower San Joaquin River Watershed <br /> Enclosure(s) Requirements for Monitoring Well Installation Workplans and Monitoring <br /> Well Installation Reports <br /> cc: Robert McClellon, San Joaquin County Environmental Health Department, <br />
The URL can be used to link to this page
Your browser does not support the video tag.