My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VIA NICOLO
>
17950
>
2900 - Site Mitigation Program
>
PR0516772
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2020 12:44:39 PM
Creation date
6/1/2020 12:23:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0516772
PE
2965
FACILITY_ID
FA0012793
FACILITY_NAME
MUSCO OLIVE LAND APP/TITLE 27
STREET_NUMBER
17950
Direction
W
STREET_NAME
VIA NICOLO
STREET_TYPE
RD
City
TRACY
Zip
95377
APN
20911032
CURRENT_STATUS
01
SITE_LOCATION
17950 W VIA NICOLO RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
893
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CENTRAL VALLEAREGIONAL WATER QUALIT'l k_'ONTROL BOARD <br /> INSPECTION REPORT <br /> DATE PREPARED: 4 May 2007 <br /> DISCHARGER: Musco Family Olive Company and the Studley Company <br /> LOCATION AND COUNTY: Wastewater Treatment and Land Disposal Facility <br /> San Joaquin County <br /> CONTACT(S): Ben Hall (Director of Environmental Services and Programs) <br /> Kelly Hegman (Technical Specialist) <br /> INSPECTION DATE: 6 April 2007 <br /> INSPECTED BY: Melissa Hall <br /> ACCOMPANIED BY: Nathan Evenson (Regional Water Board) <br /> Ben Hall (Musco) <br /> Kelly Hegman (Musco) <br /> INTRODUCTION: <br /> The Musco Family Olive Company and the Studley Company (Musco) own and operate the Musco <br /> olive processing facility and its wastewater treatment and land disposal facility (facility). The <br /> treatment system at this plant consists of flow equalization and mixing in a million-gallon (MG) <br /> pond and aeration and storage in an 84-MG reservoir. Treated wastewater is disposed of by spray <br /> irrigation. An inspection of this facility was conducted to sample tailwater from the land application <br /> areas and wastewater stored in the 84-MG reservoir. <br /> OBSERVATIONS AND COMMENTS: <br /> Nathan Evenson and I arrived at the Musco facility at approximately 10:00 a.m. and introduced <br /> ourselves to Kelly Hegman. The weather was mild, windy, and dry. <br /> Nathan and I collected samples of <br /> wastewater in the 84-million gallon reservoir <br /> -- from the upper 1-2 feet of water from the <br /> location shown in Figure 1. Kelly explained <br /> that process wastewater enters the 84- <br /> million gallon reservoir from near the base <br /> and that wastewater used for irrigation in the <br /> land application areas is taken from the <br /> upper few feet of the reservoir. Reservoir <br /> samples were analyzed for biochemical <br /> oxygen demand (BOD), total and fixed <br /> f° dissolved solids, and various inorganics and <br /> pesticides. The analytical results are <br /> X47 attached. <br /> Figure ]—Reservoir Sampling Location <br /> Approved: io: oaiarz <br /> w+somHALu�e INWaxogWWWr Wv alr gRpQW70406 We <br />
The URL can be used to link to this page
Your browser does not support the video tag.