My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VIA NICOLO
>
17950
>
2900 - Site Mitigation Program
>
PR0516772
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2020 12:44:39 PM
Creation date
6/1/2020 12:23:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0516772
PE
2965
FACILITY_ID
FA0012793
FACILITY_NAME
MUSCO OLIVE LAND APP/TITLE 27
STREET_NUMBER
17950
Direction
W
STREET_NAME
VIA NICOLO
STREET_TYPE
RD
City
TRACY
Zip
95377
APN
20911032
CURRENT_STATUS
01
SITE_LOCATION
17950 W VIA NICOLO RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
893
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> MONITORING AND REPORTING PROGRAM NO.R5-2002-0148 -3 <br /> MUSCO FAMILY OLIVE COMPANY AND THE STUDLEY COMPANY <br /> WASTEWATER TREATMENT AND LAND DISPOSAL FACILITY <br /> SAN JOAQUIN COUNTY <br /> 4 Runoff monitoring of the application areas shall be performed daily. Frequency of monitoring during the day <br /> shall be sufficient to determine if runoff is occurring. <br /> 5 If possible,flows shall be metered. If flows from certain areas cannot be metered,then flows shall be <br /> estimated based upon drainage basin and intensity of storm Calculations shall be shown. <br /> In addition, the Discharger shall maintain a daily log of discharges to the land application area. <br /> Notations shall record which area is receiving wastewater, observations of ponding water, saturated soil, <br /> odors, insects, or other potential nuisance conditions. The notations shall also document any corrective <br /> actions taken. A copy of the entries made in the log during each month shall be submitted along with <br /> monthly monitoring reports. <br /> SITE SPECIFIC GROUNDWATER MONITORING <br /> Prior to completion and/or sampling of any groundwater monitoring wells, the Discharger shall submit <br /> plans and specifications to the Board for review and approval. Once installed, all new wells shall be <br /> added to the MRP and shall be sampled and analyzed according to the schedule below. <br /> Prior to sampling or purging, equilibrated groundwater elevations shall be measured to the nearest 0.01 <br /> foot. Depth to groundwater measurements shall be collected from all wells on the same day. The wells <br /> shall be purged at least three well volumes until pH and electrical conductivity have stabilized. Sample <br /> collection shall follow standard EPA analytical method protocols. Groundwater monitoring shall <br /> include, at a minimum, the following: <br /> Sampling Reporting <br /> Constituent Units Type of Sample Freauencv Freauencv <br /> Depth to Groundwater 0.01 R Measurement Quarterly Quarterly <br /> Groundwater Elevation 0.01 ft Calculated Quarterly Quarterly <br /> Gradient ft/ft Calculated Quarterly Quarterly <br /> Gradient Direction Degrees Calculated Quarterly Quarterly <br /> pH S.U. Grab Quarterly Quarterly <br /> BOD mg/1 Grab Quarterly Quarterly <br /> Total Dissolved Solids mg/1 Grab Quarterly Quarterly <br /> Fixed Dissolved Solids mg/1 Grab Quarterly Quarterly <br /> Nitrate as Nitrogen mg/l Grab Quarterly Quarterly <br /> Total Kj eldahl Nitrogen mg/l Grab Quarterly Quarterly <br /> General Minerals t mg/1 Grab Quarterly Quarterly <br /> 'including chloride,sulfate,bicarbonate alkalinity, carbonate alkalinity, calcium,magnesium,potassium,sodium boron, <br /> and ammonia. <br /> PAN LYSIMETER MONITORING <br /> Prior to completion and/or sampling of any pan lysimeters,the Discharger shall submit plans and <br /> specifications to the Board for review and approval. Pan lysimeters shall collect percolate at a depth of <br />
The URL can be used to link to this page
Your browser does not support the video tag.