Laserfiche WebLink
STAFF REPORT <br /> MUSCO FAMILY OLIVE COMPANY AND THE STUDLEY COMPANY <br /> WASTEWATER TREATMENT AND LAND DISPOSAL FACILITY <br /> SAN JOAQUIN COUNTY <br /> CONSIDERATION OF REVISED WASTE DISCHARGE REQUIREMENTS <br /> AND OF A CLEANUP AND ABATEMENT ORDER <br /> INTRODUCTION <br /> This staff report addresses two items that will be considered by the Regional Board at its <br /> 6 September 2002 meeting. The first item is consideration of adoption of Waste Discharge <br /> Requirements (WDRs) and the second item is consideration of adoption of a Cleanup and <br /> Abatement (C&A) Order. The WDR is an update of existing WDRs Order No. 97-037; the C&A <br /> Order allows the Discharger a two year time period to meet the effluent limitations in the WDRs. <br /> BACKGROUND <br /> Musco Family Olive Company and the Studley Company(hereafter jointly referred to as <br /> "Discharger") operate an olive processing and canning facility at 17950 Via Nicole, Tracy in San <br /> Joaquin County. Musco Family Olive Company operates the facility on land leased from the <br /> Studley Company, a California Limited Partnership. <br /> Year-round olive processing activities include receiving, lye curing, brining, pitting, and <br /> canning. These activities generate wastewater with elevated concentrations of salt (specifically, <br /> dissolved inorganic solids [DIS]), sodium, and chloride). WDRs Order No. 97-037 requires the <br /> Discharger to separate the wastewater based on DIS concentrations; wastewater with DIS <br /> concentrations exceeding 1,340 mg/1 must be directed to one of two Title 27 ponds, while the <br /> lower strength wastewater can be discharged to a one-million gallon storage pond prior to land <br /> application. Due to the differing character of the two waste streams, this facility is regulated by <br /> two separate WDRs. WDRs Order No. 96-075 regulates the concentrated brines sent to the Title <br /> 27 ponds, while Order No. 97-037 regulates the less concentrated wastewater that is applied to <br /> land. <br /> WDRs Order No. 97-037 allows the Discharger to discharge up to 500,000 gallons per day (gpd) <br /> of wastewater to 200 acres of land. Among other items, the WDRs specify that the land must be <br /> cropped, that wastewater shall not stand on any check more than 12 hours, that wastewater will <br /> not be applied during rain events, and that wastewater may not enter surface waters. The WDRs <br /> have specific annual and daily loading rates for biochemical oxygen demand (BOD) and DIS. <br /> HISTORY <br /> In January 2000, the Discharger submitted a Report of Waste Discharge(RWD)requesting an <br /> increase in both the allowable flow limit and the DIS loading limit for wastewater applied to <br /> land. The Discharger stated that it had acquired another similar facility in Visalia, closed the <br /> facility, and transferred the production from that facility to the Tracy facility in 1999. As part of <br /> the review of the RWD, staff conducted a site inspection in May 2000. Staff found numerous <br /> violations, including evidence that: the one-million gallon storage pond had spilled wastewater <br /> CAWWDOWSDcskmp� 02-Staff Re ft.d« <br />