Laserfiche WebLink
MONITORING AND REPORTING PROGRAM 3 _ <br /> MUSCO FAMILY OLIVE COMPANY AND THE STUDLEY COMPANY <br /> WASTEWATER TREATMENT AND LAND DISPOSAL FACILITY <br /> SAN JOAQUIN COUNTY <br /> 5 If possible, flows shall be metered. If flows from certain areas cannot be metered,then flows shall be estimated <br /> based upon drainage basin and intensity of storm. Calculations shall be shown. <br /> In addition, the Discharger shall maintain a daily log of discharges to the land application area. Notations <br /> shall record which area is receiving wastewater, observations of ponding water, saturated soil, odors, <br /> insects, or other potential nuisance conditions. The notations shall also document any corrective actions <br /> taken. A copy of the entries made in the log during each month shall be submitted along with monthly <br /> monitoring reports. <br /> SITE SPECIFIC GROUNDWATER MONITORING <br /> Prior to completion and/or sampling of any groundwater monitoring wells, the Discharger shall submit <br /> plans and specifications to the Board for review and approval. Once installed, all new wells shall be <br /> added to the MRP and shall be sampled and analyzed according to the schedule below. <br /> Prior to sampling or purging, equilibrated groundwater elevations shall be measured to the nearest 0.01 <br /> foot. Depth to groundwater measurements shall be collected from all wells on the same day. The wells <br /> shall be purged at least three well volumes until pH and electrical conductivity have stabilized. Sample <br /> collection shall follow standard EPA analytical method protocols. Groundwater monitoring shall include, <br /> at a minimum, the following: <br /> Sampling Reporting <br /> Constituent Units Type of Sample Frequency Frequency <br /> Depth to Groundwater 0.01 ft Measurement Quarterly Quarterly <br /> Groundwater Elevation 0.01 ft Calculated Quarterly Quarterly <br /> Gradient ft/ft Calculated Quarterly Quarterly <br /> Gradient Direction Degrees Calculated Quarterly Quarterly <br /> pH S.U. Grab Quarterly Quarterly <br /> Total Dissolved Solids mg/1 Grab Quarterly Quarterly <br /> Fixed Dissolved Solids mg/1 Grab Quarterly Quarterly <br /> Nitrate as Nitrogen mg/1 Grab Quarterly Quarterly <br /> Total Kjeldahl Nitrogen mg/1 Grab Quarterly Quarterly <br /> General Minerals] mg/1 Grab Quarterly Quarterly <br /> Including chloride,sulfate,bicarbonate alkalinity,carbonate alkalinity,calcium,magnesium,potassium,sodium,boron, <br /> and ammonia. <br /> PAN LYSIMETER MONITORING <br /> Prior to completion and/or sampling of any pan lysimeters, the Discharger shall submit plans and <br /> specifications to the Board for review and approval. Pan lysimeters shall collect percolate at a depth of <br /> five feet below the ground surface. Once installed, all new pan lysimeters shall be added to the MRP and <br /> shall be sampled and analyzed according to the schedule below. <br /> CVT'D]WL""RhnM'MMRRIty <br /> L <br />