My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VIA NICOLO
>
17950
>
2900 - Site Mitigation Program
>
PR0516772
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2020 12:44:39 PM
Creation date
6/1/2020 12:23:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0516772
PE
2965
FACILITY_ID
FA0012793
FACILITY_NAME
MUSCO OLIVE LAND APP/TITLE 27
STREET_NUMBER
17950
Direction
W
STREET_NAME
VIA NICOLO
STREET_TYPE
RD
City
TRACY
Zip
95377
APN
20911032
CURRENT_STATUS
01
SITE_LOCATION
17950 W VIA NICOLO RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
893
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REVISED MONITORING AND REPORTING PROGRAM 97-037 Z _ <br /> MUSCO FAMILY OLIVE COMPANY AND THE STUDLEY COMPANY <br /> WASTEWATER TREATMENT FACILITY <br /> SAN JOAQUIN COUNTY <br /> Constituents Units Type of Sample Sampling Frequency Reporting Frequency <br /> Freeboard Feet Measurement Monthly Monthly <br /> Dissolved Oxygen mg/I Grab Daily Monthly <br /> Dissolved Sulfide mg/1 Grab Daily Monthly <br /> pH Std. Grab Daily Monthly <br /> Pond Condition NA Observation Daily Monthly <br /> Pond condition monitoring shall include daily determination of berm condition,wastewater overflows,and odor <br /> conditions(none,slight,moderate,strong). <br /> LAND APPLICATION AREA MONITORING <br /> Application of wastewater to the land application area shall be monitored to prevent overloading the area <br /> with wastewater constituents, which can cause objectionable odors and/or groundwater degradation. The <br /> following parameters shall be calculated and reported in the monthly monitoring reports. <br /> By 1 October 2002, the Discharger shall install a sufficient number of meters to continuously monitor the <br /> flow out of the settling/storage ponds to the land application areas. No wastewater shall be applied <br /> without metering. If portable pumps are used to discharge wastewater to the land application area or a <br /> storage pond, additional meters shall be installed at every discharge point. <br /> Constituents Units Type of Sample Frequency <br /> Flow gpd Metered Daily <br /> Application Area acres Measured' Daily <br /> Crop Planted acres Measured' Daily <br /> Hydraulic Loading Rate inches/acre/month Calculated Monthly <br /> BOD5 Loading Rate lbs/acre/day Calculated Daily <br /> Total Nitrogen Loading Rate lbs/acre/month Calculated Monthly <br /> Tailwater Generation Visual Inspection Observation Daily° <br /> Provide a map identifying field names and acreages. <br /> 2 BODS loading shall be calculated using the daily applied volume of wastewater, estimated daily application area, <br /> and the most recent results of effluent BODS. <br /> 3 Total nitrogen loading rates shall be calculated using the daily applied volume of wastewater,estimated daily <br /> application area,and the most recent total nitrogen results. <br /> a Runoff monitoring of the application areas shall be performed daily. Frequency of monitoring during the day <br /> shall be sufficient to determine if runoff is occurring. <br /> In addition, the Discharger shall maintain a daily log of discharges to the land application area. Notations <br /> shall record which area is receiving wastewater, observations of ponding water, saturated soil, odors, <br /> insects, or other potential nuisance conditions. The notations shall also document any corrective actions <br /> taken. A copy of the entries made in the log during each month shall be submitted along with monthly <br /> monitoring reports. <br />
The URL can be used to link to this page
Your browser does not support the video tag.