Laserfiche WebLink
REVISED MONITORING AND REPORTING PROGRAM 97-037 q_ <br /> MUSCO FAMILY OLIVE COMPANY AND THE STUDLEY COMPANY <br /> WASTEWATER TREATMENT FACILITY <br /> SAN JOAQUIN COUNTY <br /> Sampling Reporting <br /> Constituent Units Type of Sample Frequency Frequency <br /> General Minerals mg/1 Grab Quarterly Quarterly <br /> Electrical Conductivity µmho/cm Grab Quarterly Quarterly <br /> Sulfate mg/1 Grab Quarterly Quarterly <br /> REGIONAL GROUNDWATER MONITORING <br /> Samples shall be collected from the domestic well located at 26933 South Hansen Road, Tracy. Samples <br /> shall be collected upstream of any water treatment equipment at the residence and shall be performed as <br /> while required by the MRP and as long as the property owner grants access to the well. Sample collection <br /> shall follow standard EPA analytical method protocols. Groundwater monitoring shall include, at a <br /> minimum, the following: <br /> Sampling Reporting <br /> Constituent Units Type of Sample Frequency Frequency <br /> pH S.U. Grab Quarterly Quarterly <br /> Total Dissolved Solids mg/1 Grab Quarterly Quarterly <br /> Nitrate as Nitrogen mg/1 Grab Quarterly Quarterly <br /> Total Kjeldahl Nitrogen mg/1 Grab Quarterly Quarterly <br /> Ammonia as Nitrogen mg/1 Grab Quarterly Quarterly <br /> General Minerals mg/( Grab Quarterly Quarterly <br /> Electrical Conductivity µmho/cm Grab Quarterly Quarterly <br /> STORMWATER MONITORING <br /> Samples shall be collected from the sampling stations established in Kleinfelder's 11 January 2001 <br /> Amended Surface Water Sampling Plan and an additional sample location to be established upgradient of <br /> all application areas. Stormwater monitoring shall include at least the following: <br /> Constituents Units Sample Tyne Samplint?Frequency Reporting Frequency <br /> Total Dissolved Solids mg/1 Grab Monthly1,2 Monthly <br /> Dissolved Inorganic Solids mg/1 Grab Monthly ,2 Monthly <br /> Sodium mg/1 Grab Monthly'.' Monthly <br /> Chloride mg/1 Grab Monthlyt,2 Monthly <br /> Electrical Conductivity µmhos/cm Grab Monthly',2 Monthly <br /> BODS mg/1 Grab Monthly',2 Monthly <br /> PH S.U. Meter Monthly'.2 Monthly <br /> Samples shall be collected within'three days after the first significant rainfall of the Fall/Winter season. <br /> 2 Samples shall be collected monthly from December through April. <br />