My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VIA NICOLO
>
17950
>
2900 - Site Mitigation Program
>
PR0516772
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2020 12:35:35 PM
Creation date
6/1/2020 12:29:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0516772
PE
2965
FACILITY_ID
FA0012793
FACILITY_NAME
MUSCO OLIVE LAND APP/TITLE 27
STREET_NUMBER
17950
Direction
W
STREET_NAME
VIA NICOLO
STREET_TYPE
RD
City
TRACY
Zip
95377
APN
20911032
CURRENT_STATUS
01
SITE_LOCATION
17950 W VIA NICOLO RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Plan to Install Compliance Groundwater Monitoring Wells,Musco <br /> ' Family Olive Company Tracy Cal'rfornia <br /> A minimum of 48 hours following development,groundwater samples will be collected from the newly <br /> installed monitoring wells using sampling techniques currently used for the Musco facility groundwater <br /> monitoring program in support of WDR Order No. R5-2005-0024(As described in the associated <br /> ' groundwater monitoring reports). Depth to groundwater will be measured in each well and water- <br /> quality parameters(pH,conductivity, ORP, DO,and temperature)will also be monitored during purging. <br /> These depths and field monitoring parameters will be logged onto water level and water quality logs <br /> ' (Attachment 1).The groundwater samples will be labeled, logged on chain-of-custody forms,and placed <br /> in an ice-chilled cooler for transport to the laboratory for the same analysis required by WDR Order No. <br /> ' RS-2005-0024. <br /> Investigation Derived Waste <br /> ' Investigation derived waste water and soil generated during this investigation will be disposed of on the <br /> ground in the vicinity of the soil boring,as completed during previous monitoring well installations at <br /> ' the Musco facility. <br /> Anticipated Project Schedule <br /> ' The anticipated schedule for the project is provided below: <br /> • October 30, 2013:Submittal of Work Plan via email to the RWQCB. <br /> ' November 8,2013:Anticipated approval of Work Plan by RWQCB. <br /> • November 13, 2013: Initiate drilling activities. <br /> ' • November 22, 2013:Anticipate drilling activities to be completed. <br /> • November 25, 2013: Initiate well development activities. <br /> • November 27,2013:Complete well development activities. <br /> ' • December 9, 2013: Initiate first groundwater monitoring and sampling event. <br /> Please note that this schedule is dependent upon regulatory approval, contractor availability and <br /> ' weather conditions.Any changes to this anticipated schedule will be communicated to the RWQCB as <br /> the project is implemented. <br /> If you have any questions with regard to the procedures described in this work plan, please do not <br /> hesitate to give me a call at(510)326-1473. <br /> ' Sincerely, <br /> For Terraphase Engineering Inc. <br /> Andrew Romolo, P.G. (8110) <br /> Vice President and Principal Geologist <br /> ' Terraphase Engineering Inc. Page 5 of 6 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.