Laserfiche WebLink
Kennedy,Uenks Consultants <br /> Section 2: Preliminary Work Plan <br /> This section presents the proposed Preliminary Work Plan. <br /> 2.1 Additional Monitoring Wells <br /> Two additional groundwater monitoring wells will be installed in the vicinity of existing <br /> Well MW-1 (Figure 2). It is anticipated that both of these wells will be screened in the same <br /> shallow groundwater zone as Well MW-1. <br /> One monitoring well, Well MW-30, will be installed south of the Musco land application areas <br /> (LAA) to monitor shallow groundwater offsite and upgradient of Well MW-1. This location will <br /> provide an assessment of shallow groundwater quality entering the southern portion of the Site. <br /> One soil boring will be advanced approximately 10 to 20 feet to the west of Well MW-1. <br /> Depending upon observations during installation of Well MW-30, this boring may or may not be <br /> converted to a monitoring well. This location is intended to address two questions. First, results <br /> from this additional monitoring location would be used to obtain a detailed soil boring log for <br /> verification of the visual log previously prepared for Well MW-1. Second, if it is determined that <br /> Well MWA is no longer adequate for monitoring, Well MWAC could serve as a replacement <br /> monitoring well. <br /> Well MW-1 Condition Assessment. Simultaneous with drilling, an inspection will be made of <br /> the areas surrounding Well MW-1 and the area immediately to the south. Conditions such as <br /> surface water accumulation and runoff, soil cracking, animal wastes, and lush vegetation will be <br /> noted because these conditions may indicate water and nitrogen sources that could influence <br /> shallow groundwater quality. In addition, the integrity of the surface seal at Well MW-1 will be <br /> visually assessed. <br /> 2.2 Field Activities <br /> The following field activities will be conducted: drilling and installing the soil borings and <br /> monitoring wells, developing the wells, and collecting groundwater samples from monitoring <br /> wells for laboratory analysis. <br /> 2.2.1 Pre-Field Activities <br /> The following pre-field activities will be conducted prior to initiating fieldwork at the Site: <br /> • Update the site-specific Health and Safety Plan. <br /> • Complete access negotiations for installation and sampling of offsite monitoring wells. <br /> • Obtain well installation permits from the San Joaquin County EHD. <br /> • Select and mark the specific locations for the new monitoring wells. <br /> Preliminary Work Plan for Evaluation of Nitrogen in Groundwater Page 3 <br /> Musco Family Olive Company, Tracy, California <br /> p:Yeyewgbdminyobb2'AN104.00�nuemoNeWBrepwbNRagm xrt phUdd. <br />