Laserfiche WebLink
Ms. Jo Anne Kipps, P.E. <br /> Central Valley Region <br /> California Regional Water Quality Control Board <br /> 16 March 2004 <br /> Page 4 DRAFT <br /> Reporting <br /> Investigation results will be summarized in an Offsite Investigation Report as part of Musco's <br /> long-term compliance plan and included in the ROWD. <br /> Very truly yours, <br /> KENNEDY/JENKS CONSULTANTS <br /> Paula J. Hansen <br /> Project Manager <br /> Michael McLeod R.G. <br /> Geologist <br /> Les Chau <br /> Principal Hydrogeologist <br /> cc: Ben Hall, Musco Family Olive Company <br /> Michael A. Campos, Stoel Rives <br /> ;,tis grcup�dmin4ob1021020704.00_muscmllvelD6c pndity pin o0sitegmhaftx pindx <br />