Laserfiche WebLink
Well lnstallatfon Field Report <br /> F Former Laura Scudder'e Tracy plant <br /> "0 W- Valpica Road, Tracy, California <br /> On March 26, 1990, ROY F. WESTON, INC, WESTON <br /> groundwater monitoring well at the former Laura cudder s single <br /> facility located at loo W. Valpico Road in Trac ' Tracy <br /> Purpose of installing this well was toy, California. The <br /> beneath the former underground storage tank access locationto dwater <br /> Groundwater samples for petroleum hydrocarbons will be collected at <br /> a future date. <br /> All field work was performed under Level D safety conditions and a <br /> worksafety <br /> tomdiscueeting was sheld with the prior to starting <br /> s Pottial site ha ards and emergency procedures. <br /> The monitoring well location is presented on Figure A-1. The well <br /> was located five feet northwest of a soil boring which was drilled, <br /> logged and sampled on January 24, 1990 and discussed in detail in <br /> WESTON's "Soil Remediation Proposal" dated January 31, 1 <br /> to the wells close proximity to the soil boring980. Due <br /> w , no soil samples <br /> are collected and no lithologic l <br /> Observation of cuttings rog was made of the boring, <br /> eturned to the surfacf, during the well <br /> installation indicated, lithologically, that subsurface stratigra- <br /> phy in the well was virtually identical <br /> soil boring. to that encountered in the <br /> The well was drilled using a CKE-55 drilling rig with a 9 14 <br /> diameter hollow stem auger. The boring was advanced to a/ Inch <br /> mately 5o feet below ground surface the hole ted for <br /> the presence of groundwater. The depth to depth water was measured using <br /> an electronic sounding.device and found tobe48.9 feet BGS. The <br /> boring was then advance to a total depth of 59 feet. After the <br /> center rods were removed, the total depth was measured again and <br /> found to be 5a.5 feet, a loss of one half foot due to heaving <br /> sands. When the PVC screen and casing was installed, the sand had <br /> M lowered back to 59 feet. <br /> The well was constructed using four inch diameter, <br /> schedule 40 PVC pipe. The screen was 15 feet lon `flush threaded, <br /> three five-foot <br /> sections) and composed of factory slotted, four inch diameter, <br /> flush threaded schedule 40 PVC pipe. Slot size was 0.020 inch. <br /> All PVC pipe used in the well was steam cleanedprior to _ <br /> .,� tion. The bottom of the screen was fitted with a screw-on 1PVcacap, <br /> while the top of the well was covered <br /> locking cap is to with a slip-on PVC cap. A <br /> be installed later. comp <br /> a flush mounted well vault with a screwThe tightenedecover?etion was <br /> The sand <br /> pack consisted of ba <br /> into place around-the-_PVC-thr ugh--ted he-auger fl ghts.0 Lonestar No. 3 Asnthe�sand -- <br /> - - - - — <br /> 4- _- -pack-was placed, the augers were removed from the hole, allowing <br /> the sand to settle around the screened interval. The sand pack was <br /> constructed to three feet above the top of the screened interval. <br /> i <br /> Bill MIN1111111 <br />