My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VAN BUREN
>
424
>
3500 - Local Oversight Program
>
PR0545786
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2020 1:59:22 PM
Creation date
6/1/2020 1:51:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545786
PE
3526
FACILITY_ID
FA0004969
FACILITY_NAME
CHASE CHEVROLET
STREET_NUMBER
424
Direction
N
STREET_NAME
VAN BUREN
STREET_TYPE
ST
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
424 N VAN BUREN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Jeff Setness October 27, 1998 <br /> Auto Investments 2- <br /> • The actual costs and scope of work performed must be consistent with the pre-approval for it to remain valid. <br /> • The work products must be acceptable to the County and the Regional Water Quality Control Board. <br /> • It is my opinion that it is unnecessary to obtain three bids for this scope of work; the Fund's three bid <br /> requirement is waived for this scope of work. <br /> • If a different scope of work becomes necessary,then you must request pre-approval of costs on the new <br /> scope of work. <br /> • Although I have referred to the Advanced Geotechnical proposal in my pre-approval above,please be aware <br /> that you will be entering into a private contract: the State of California cannot compel you to sign any <br /> specific contract. This letter pre-approves the costs as presented in the proposal dated July 8, 1998 by <br /> Advanced Geotechnical for conducting the work approved by the County for implementing the May 1997, <br /> Advanced Geotechnical workplan. <br /> I also want to remind you that the Fund's regulations require that you obtain at least three bids, or a bid waiver <br /> from Fund staff, from qualified firms for all necessary corrective action work. The legislation governing the <br /> Fund requires that the Fund assist you in procuring contractor and consultant services for corrective action. If <br /> you need assistance in contracting for corrective action services, don't hesitate to call me. <br /> Please remember that it is still necessary to submit the actual costs of the work as explained in the <br /> Reimbursement Request Instructions to confirm that the costs are consistent with this pre-approval before you <br /> will be reimbursed. To make this easier, insure that your consultant prepares his invoices to match the format <br /> of the original estimate, and provides reasonable explanations for any changes made in the scope of work or <br /> increases in the costs. When the invoices are submitted you must include copies of all: <br /> • subcontractor invoices, <br /> • technical reports, when available, and <br /> • applicable correspondence from the County. <br /> Please call if you have any questions; I can be reached at(916)227-4463. <br /> Sincerely, <br /> Nina Ciani, Sanitary Engineering Associate <br /> Technical Review Unit <br /> Underground Storage Tank Cleanup Fund <br /> Enclosure <br /> cc: Ms.Margaret Lagorio <br /> San Joaquin County EHD <br /> P.O.Box 2009 <br /> Stockton, CA 95201 <br /> California Environmental Protection Agency <br /> C4 Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.