My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VAN BUREN
>
424
>
3500 - Local Oversight Program
>
PR0545786
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2020 1:59:22 PM
Creation date
6/1/2020 1:51:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545786
PE
3526
FACILITY_ID
FA0004969
FACILITY_NAME
CHASE CHEVROLET
STREET_NUMBER
424
Direction
N
STREET_NAME
VAN BUREN
STREET_TYPE
ST
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
424 N VAN BUREN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�CIT'W F STOCKTON <br /> _ :-AI_T!t <br /> DEPARTMENT OF PUB4LR�1- KPM I!:-0.7 <br /> CITY HALL <br /> 425 N. EL DORADO STREET <br /> STOCKTON,CA 95202-1997 <br /> November 2, 1995 <br /> Bob Marty <br /> Advanced GeoEnvironmental, Inc. <br /> 1803 West March Lane, Suite A <br /> Stockton, CA 95762 <br /> REVOCABLE PERMIT REQUEST FOR GROUNDWATER MONITORING WELLS AT <br /> 424 VAN BUREN STREET (CHASE CHEVROLET SITE) <br /> The permitting process required in the City of Stockton for <br /> installation of groundwater monitoring wells is a two phase <br /> process . First, a Revocable Permit must be issued, wherein the <br /> City grants permission to the property owner to install and <br /> maintain a private well within the City' s right-of-way. Second, an <br /> Encroachment Permit is issued which allows the actual construction <br /> of 'the well to be carried out in our right-of-way. <br /> In order to issue the Revocable Permit the City requires the <br /> following: <br /> 1 . A formal written request for a Revocable Permit in which <br /> you acknowledge that you have read and understand the <br /> City' s Standard Conditions Applicable to Revocable <br /> Permits . An acceptable application form and copy of the <br /> Standard Conditions are enclosed. <br /> 2 . A processing fee payable to the City of Stockton in the <br /> amount of $310 . 00 . <br /> 3 . A detailed work plan including a sketch showing the <br /> location of the proposed well (s) . <br /> 4 . A Faithful Performance Bond, or other acceptable form of <br /> financial security, in an amount of $500 . 00 per well will <br /> be required. This bond shall remain in effect for as <br /> long as the well remains in the City' s right-of-way. <br /> 5 . A certificate of insurance naming the City as additional <br /> insured. Insurance is required for the agency obtaining <br /> "STOC:KTON...CALIFORNIA'S SUNRISE SEAPORT" <br />
The URL can be used to link to this page
Your browser does not support the video tag.