My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VAN BUREN
>
424
>
3500 - Local Oversight Program
>
PR0545786
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2020 1:56:21 PM
Creation date
6/1/2020 1:53:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545786
PE
3526
FACILITY_ID
FA0004969
FACILITY_NAME
CHASE CHEVROLET
STREET_NUMBER
424
Direction
N
STREET_NAME
VAN BUREN
STREET_TYPE
ST
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
424 N VAN BUREN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 3 <br /> SUMMARY OF WELL DESTRUCTION <br /> 424 NORTH VAN BUREN STREET,AREA 16 <br /> Stockton, California <br /> ' Well Destruction Method* Casing Casing <br /> Well Identification Drill Out Well pressure Diameter Depth Type of Well <br /> Grout Well (inches) (feet) <br /> MW-3 1 2 44 Monitorin <br /> MW-6 1 2 45 Monitorin <br /> MW-7 1 2 45 Monitoring i <br /> MW-9 1 2 42 Monitorin <br /> MW-10 1 2 37 Monitorin <br /> MW-14 1 2 36 Monitorin <br /> MW-15 1 2 36 Monitorin <br /> MW-16 I 2 38 Monitorin <br /> ' MW-17 1 2 36 Monitorin <br /> MW-22 1 2 30 Monitorin <br /> MW-23 1 2 30 Monitorin <br /> ' MW-24 1 2 30 Monitorin <br /> EW-3 1 4 35 Extraction <br /> EW-4 1 4 35 Extraction <br /> SW-1 through SW-4** 4 1 38 Air S at e <br /> SW-5 through 19, and 11 1 38 Air Sparge <br /> through 23 18 <br /> SW-10 *** 0 1 38 Air S ar e <br /> VW-1 1 2 25 Va or Extraction <br /> VW-2 1 2 25 Va or Extraction <br /> VW-3 1 2 25 Va or Extraction <br /> VW-4 1 2 25 Vapor Extraction <br /> VW-5 1 2 25 vapor Extraction <br /> A-1 through A-4 4 1 25 Ozone Sparge <br /> B-1 through B-4 4 1 25 Ozone Sparge <br /> C-1 through C-5 4 1 25 Ozone S ar e <br /> D-1 through D-4 4 1 1 25 Ozone S ar e <br /> Total Wells Destroyed 53 4 <br /> Notes <br /> *Well destruction occurred between 1 and 26 March 2004 <br /> * * SJCEHD personnel approved pressure grouting of wells SW-1 through SW-4 because of their <br /> proximity to overhead electrical lines. <br /> *** SW-10 has not yet been located or destroyed <br /> 25971014-tables-Table 3 Well Dest Page 1 of 1 April 2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.