My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008852
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VAN BUREN
>
424
>
3500 - Local Oversight Program
>
PR0545786
>
ARCHIVED REPORTS_XR0008852
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2020 2:34:23 PM
Creation date
6/1/2020 2:02:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008852
RECORD_ID
PR0545786
PE
3526
FACILITY_ID
FA0004969
FACILITY_NAME
CHASE CHEVROLET
STREET_NUMBER
424
Direction
N
STREET_NAME
VAN BUREN
STREET_TYPE
ST
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
424 N VAN BUREN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 5 <br /> SOIL AND GROUND WATER CORRECTIVE ACTION ALTERNATIVES <br /> Former Chase Chevrolet(Van Buren) Facility <br /> 424 North Van Buicn Street, Stockton, California <br /> Estimated Costs Typical <br /> Method Advantages Disadvantages (incl Monitoring Estimated <br /> Monitoring and Duration <br /> _ Maintenance) Requirements <br /> In-situ Soil Vapor • Easily combined with other Greater than 90%reduction of $60,000 (o Weekly dad monthly 18 to 24 <br /> Extraction methods(t e IAS)• Readily contaminants generally not $100,000 annually vapor sampling,semi- months <br /> available equipment• attainable• Large initial annual or annual soil <br /> Section 5 1 Conducive site conditions• cquipmcnt cost• Supplemental sampling <br /> Relatively rapid cleanup period fuel required and costs can be <br /> (18 to 36 months)•Can cleanup cxcessive as contaminants <br /> contaminated soil under decrease• Air permitting <br /> structures required • Only non-saturated <br /> soils cleaned up <br /> Excavation •Theoretical removal of 100% •Cost-effectiveness decreases $125,000 to Monitoring of 1 month,6 to <br /> of contaminants• Relatively with depth of contamination • $175,000 for excavated soil, 12 months if <br /> Section S 2 short remediation period• Cannot cleanup under excavation,disposal collection of soil treatment is <br /> Effective remediation of all soil structures• Excavated soil and backfill samples upon required <br /> types must be treated or disposed• completion of <br /> Backfill matei ial and excavation <br /> compaction costs can be <br /> excessive <br /> In-situ • Relatively simple design and • Regulatory approval can be $80,000 to Monthly vapor 18 to 36 <br /> Bioremediation operation• Short treatment difficult to obtain •Additional $130,000 total cost monitoring,quarterly months <br /> (Soil) period,usually 12 to 36 months inoculations and nutrient soil sample collection, <br /> • Works well in most soil types supplementation sometimes micro biological <br /> Section 5 3 where no biotoxicity is present necessary • Less effective in analysis of samples <br /> soils with high concentrations <br /> of hydrocarbons Al <br />
The URL can be used to link to this page
Your browser does not support the video tag.