Laserfiche WebLink
26 June 2002 <br /> AGE-NC Project No 95-0143 <br />' Page 4 of 4 <br /> I quarterly monitoring should be performed in August 2002, concurrent with monitoring at the <br /> Madison site <br />' An AGE-prepared Feasibility Studies and Monitoring Well Installation Work Plan,dated 17 April <br /> 2002,was approved by the EHD by letter dated 15 May 2002 The scope of work include abandoning <br /> and replacing vapor extraction well VW-3, installation of one additional ground water monitoring <br />' well, installation of six ozone sparge points and performance of an ozone sparge feasibility test <br /> Upon pre-approval by the UST Cleanup Fund, AGE will schedule field work with the EHD <br /> 6.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based mainly <br /> upon analytical results provided by an independent laboratory Evaluations of the ground water <br />' conditions at the site have been made from a limited number of available data points(i a monitoring <br /> wells and ground water samples), and subsurface conditions may vary through time and with <br /> • distance from these data points No other warranty, expressed or implied, is made as to the <br /> professional interpretations, opinions and recommendations contained in this report <br /> I <br /> I <br /> • <br /> Advanced GeoEnvironmental,Inc <br /> I <br />