Laserfiche WebLink
i <br /> TABLE OF CONTENTS <br />' 10 INTRODUCTION 1 <br />' 20 BACKGROUND 1 <br /> 30 GROUND WATER AQUIFER PUMPING TEST 2 <br /> I31 8-HOUR STEP DRAW-DOWN PUMPING TEST 3 <br /> 3 1 1 Pump Test Results 3 <br />' 3 1 2 Extracted Water Sampling Procedures 4 <br /> 3 1 3 Extracted Water Analytical Results 5 <br /> 3 1 4 Purged Ground Water Disposal 5 <br />' 3 2 24-HOUR CONSTANT RATE PUMPING TEST 6 <br /> 3 2 1 Pump Test Results 6 <br />' 3 2 2 Aquifer Pumping Analysis 7 <br /> 3 23 Extracted Water Sampling Procedures 8 <br /> 3 2 4 Extracted Water Analytical Results 8 <br /> 3 2 5 Purged Ground Water Disposal 8 <br />' <br /> 40 SUMMARY AND CONCLUSIONS 8 <br />' 50 RECOMMENDATIONS 9 <br /> 60 LIMITATIONS 10 <br /> LIST OF FIGURES <br />' Figure I -Location Map <br /> Figure 2 -Site Map <br /> Figure 3 - Ground Water Pumping Test Radius of Influence 8 GPM <br /> LIST OF TABLES <br /> Table 1 - Well Construction Specifications <br />' Table 2 -Aquifer Pumping Test Draw down Results 8-Hour Step Draw-down Test <br /> Table 3 -Analytical Results of Grab Ground Water Samples <br /> Table 4 -Aquifer Pumping Test Draw-down Results 24-Hour Constant Rate Test <br /> Advanced GeoEnvironmental,Inc <br />