My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008891
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VAN BUREN
>
424
>
3500 - Local Oversight Program
>
PR0545786
>
ARCHIVED REPORTS_XR0008891
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2020 2:37:00 PM
Creation date
6/1/2020 2:11:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008891
RECORD_ID
PR0545786
PE
3526
FACILITY_ID
FA0004969
FACILITY_NAME
CHASE CHEVROLET
STREET_NUMBER
424
Direction
N
STREET_NAME
VAN BUREN
STREET_TYPE
ST
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
424 N VAN BUREN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16 <br /> TABLE 3 <br /> SUMMARY OF WELL DESTRUCTION <br /> 424 NORTH VAN BUREN STREET, AREA 16 <br /> Stockton, California <br /> Well Destruction Method* Casing Casing <br /> Well Identification Pressure Diameter Depth Type of Well <br /> Drill Out Well <br /> Grout Well (inches) (feet) <br /> MW-3 1 2 44 Monitoring <br /> MW-6 1 2 45 Monitoring <br /> MW-7 1 2 45 Monitoring <br /> MW-9 1 2 42Monitorin <br /> MW-10 1 2 37 Monitoring <br /> MW-14 1 2 36 Monitoring <br /> MW-15 i 2 36 Manrtonn <br /> MW-16 1 2 38 Monitonn <br /> MW-17 1 2 36 Monitorin <br /> MW-22 1 2 30 Monitoring <br /> MW-23 1 2 30 Monitoring <br /> MW-24 1 2 30 Monitoring <br /> EW-3 1 4 35 Extraction <br /> EW-4 1 4 35 Extraction <br /> SW-1 through SW-4** 4 1 38 Air Sparge <br /> SW-5 through 19, and 1 1 <br /> through 23 18 1 38 Air Sparge <br /> SW-10 *** 0 1 1 38 Air Sparge <br /> VW-1 1 2 25 Vapor Extraction <br /> VW-2 1 2 25 Vapor Extraction <br /> VW-3 1 2 25 Vapor Extraction <br /> VW-4 1 2 25 Vapor Extraction <br /> VW-5 1 2 25 Vapor Extraction <br /> A-1 through A-4 4 1 25 Ozone Sparge <br /> B-1 through B-4 4 1 25 Ozone Sparge <br /> C-1 through C-5 4 1 25 Ozone Sparge <br /> D-1 through D-4 4 1 25 Ozone Sparge <br /> Total Wells Destroyed 53 4 <br /> Notes <br /> * Well destruction occurred between 1 and 26 March 2004 <br /> * * SJCEHD personnel approved pressure grouting of wells SW-1 through SW-4 because of their <br /> proximity to overhead electrical lines <br /> *** SW-10 has not yet been located or destroyed <br /> 25971014-tables-Table 3 Well Dest Page 1 of 1 April 2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.