Laserfiche WebLink
CAIR JC,4ACADEMYACADEMYgrant <br /> Stocktonon Metropolitan Airport <br /> J7233 C.E.Dixon St,Stockton,CA 95206 <br /> ACADEMY TO 209-983.2700,209-992-5213 Fax 209.982-8273 <br /> Ftdessloral A dre Pilot Tr6rng www.JCAirAcademy.com <br /> The following topics have been addressed: <br /> 1. Emergency Response/Contingency Plan training. <br /> 2. Spill notification procedures. <br /> 3. Spill response procedures. <br /> 4. Evacuation procedures. <br /> Printed name Signature Date <br /> -'VOYL Yeo .0 A ( 1, I� <br /> H 5w Cho 6Z I <br /> �5 C 0 - 01 0 <br /> Business plans shall include provisions for ensuring that appropriate personnel receive initial and annual <br /> refresher training.All employees shall be trained in safety procedures in the event of a release or <br /> threatened release of a hazardous material, including, but not limited to,familiarity with the following <br /> plans and procedures: <br /> (A) Immediate notification contacts to the appropriate local emergency response personnel and to the <br /> unified program agency. <br /> (B) Procedures for the mitigation of a release or threatened release to minimize any potential harm or <br /> damage to persons,property,or the environment. <br /> (C) Evacuation plans and procedures, including immediate notice,forthe business site. <br /> This training shall be documented electronically or by hard copy and shall be made available for a <br /> minimum of three years. <br /> Immediately provide employee training for appropriate personnel and submit a copy of the training <br /> records to the EHD. <br />