Laserfiche WebLink
SVE SYSTEM OPERATION SUMMARY <br /> Former CHASE CHEVROLET (Van Buren) Facility <br /> Date Time Down Time Operatonal Flow Rate Total Flow <br /> (hh mm) Time (cfm) (cubic feet) <br /> I11/3/99 11 15 Start <br /> 11/15/99 08 50-0930 040 45620 277 7,584,260 <br /> 11/19/99 15 15-1540 025 <br /> I11122-11/23/99 1240-11 00 2220 <br /> 11/29/99 07 40-07 50 0 10 168 50 270 2,735,100 <br />' 11/30/99 1200 N/A <br /> 24345 268 3,919,500 <br /> 12/10/99 15 45-1600 0 15 <br />' <br /> 6800 267 1,089,360 <br /> 12/13/99 1200 N/A <br /> 12/21/99 1446 Sample 85240 268 13,710,880 <br /> 1/18/00 00 40-15 00 1420 <br /> 23 25 269 377,945 <br /> 1/19/00 1425 Sample <br /> 1/23-1/24/00 11 15-1540 2825 9250 269 1,498,330 <br /> 3 35 265 56,975 <br /> 1/24-1126100 19 15-1600 4445 <br /> 213100 1200 NIA 18800 267 3,011,760 <br /> 14400 264 2,280,960 <br /> 2/9/00 1200 N/A <br /> 2/10-2/11/00 12 00-14 35 2635 2400 266 383,040 <br /> 2122100 12 00 NIA 26125 264 4,140,840 <br /> I <br /> 2 <br /> 2123100 1200 NIA 2400 261 375,840 <br /> 2/24-2/25/00 14 30-15 45 25 15 <br /> 8115 268 1,306,500 <br /> 2/27-2128/00 06 00-13 45 31 45 <br /> I2/29-3/3/00 06 15-08 00 73 45 <br /> 318100 1225 Sample 14800 268 2,379,840 <br /> 3/9/00 1200 N/A <br /> 3/24100 11 40-12 25 045 503 15 269 8,122,455 <br /> 3/30/00 1200 N/A <br /> 3/31100 2400 N/A 3600 266 574,560 <br /> Total 269 25 331920 53,548,145 <br /> cfm cubic feet per minute <br />