My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008906
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VAN BUREN
>
424
>
3500 - Local Oversight Program
>
PR0545786
>
ARCHIVED REPORTS_XR0008906
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2020 2:32:11 PM
Creation date
6/1/2020 2:23:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008906
RECORD_ID
PR0545786
PE
3526
FACILITY_ID
FA0004969
FACILITY_NAME
CHASE CHEVROLET
STREET_NUMBER
424
Direction
N
STREET_NAME
VAN BUREN
STREET_TYPE
ST
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
424 N VAN BUREN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br /> a e <br /> 10 INTRODUCTION 1 <br />' 20 PROCEDURES 1 <br /> 21 HORIZONTAL WELL INSTALLATION 1 <br /> I <br /> 22 TRENCHING SOIL DISPOSAL 2 <br /> 23 DRILLING AND SAMPLING 2 <br /> 24 LOGGING 3 <br /> 25 WELL AND BORING COMPLETION 3 <br /> 26 LABORATORY ANALYSES OF SOIL SAMPLES 3 <br /> 27 MONITORING WELL PURGE PROCEDURES 4 <br />' <br /> 28 COLLECTION OF GROUND WATER SAMPLES 4 <br /> 29 SURVEYING 4 <br /> 210 INSTALLATION OF SVE/IAS UNITS 5 <br /> 3 0 FINDINGS 5 <br /> 31 STRATIGRAPHY 5 <br /> I3 2 ANALYTICAL RESULTS OF SOIL SAMPLES 5 <br /> 3 3 GROUND WATER ELEVATION AND GRADIENT 6 <br /> 34 ANALYTICAL RESULTS OF WATER SAMPLES 6 <br /> 40 SUMMARY/CONCLUSIONS 7 <br /> 5 0 RECOMMENDATIONS 8 <br /> 60 LIMITATIONS g <br /> FIGURES <br /> Figure 1 -Location Map <br /> Figure 2 - Vicinity Map <br /> Figure 3 - Remediation System <br /> I Figure 4 - Horizontal Well Construction <br /> Figure 5 -Sparging Well Construction <br /> Figure 6 - Vapor Well Construction <br />' Figure 7 - Ground Water Elevation <br /> I <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.