My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SCHULTE
>
14700
>
2900 - Site Mitigation Program
>
PR0505610
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2020 9:10:37 AM
Creation date
6/2/2020 9:06:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505610
PE
2960
FACILITY_ID
FA0021698
FACILITY_NAME
OWENS BROCKWAY GLASS CONTAINER
STREET_NUMBER
14700
Direction
W
STREET_NAME
SCHULTE
STREET_TYPE
RD
City
TRACY
Zip
95377
APN
20924024
CURRENT_STATUS
01
SITE_LOCATION
14700 W SCHULTE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAR. -H' 95(THU) 16: 19 NOLTE & ASSOC. SAt;TO TEL:916 641 9222 P. U11 <br /> Mr. Jim Hamrick <br /> July 14, 1994 <br /> Page 10 <br /> T"LE 3 MONITORING WELL DESIGN CRI 'SMA <br /> Item Value <br /> Drilling Method Direct Rotary Drilling <br /> Depth Depth varies From 30 ft to <br /> 190 ft depending on first <br /> water bearing zone <br /> encountered, <br /> Well Bore 7.25 in <br /> Casing Diameter 2 in Schedule 40 PVC <br /> Screen Casing Slot Size 0,020 in <br /> To be determined based on <br /> Screen Casing Settings the first water bearing zone <br /> encountered. <br /> dissolved solids (i"DS), electrical conductivity (E.C.), chloride and nitrate. The <br /> recommended sampling interval for the first year is twice per year (April and October) then <br /> annually in October in subsequent years. During each sampling event the depth to ground <br /> water will be determined, A general minerals analysis includes alkalinity, chloride, electrical <br /> conductivity, hardness, pH, MEAS, sulfate, TDS, calcium, copper, iron, manganese, solium, <br /> zinc. <br /> WASTEWATER DISPOSAL SYSTEM WATER BALANCE <br /> VSlAtewater Production <br /> The Owens-Brockway facility operates 24 hours/days 7 days/weeks and produces a relatively <br /> constant amount of wastewater. The wastewater flow to the evaporation ponds consists of <br /> reverse osmosis (RO) backwash water and minor amounts of process water. <br /> Wastewater Disposal Capacity <br /> The three wastewater evaporation ponds have a combined surface area of approximately <br /> 24,965 square feet with an average depth of 7.7 ft. Total capacity of the wastewater <br /> evaporation ponds is 1.43 million gallons. Wastewater is discharged to Pond 1. As Pond 1 <br /> NOLTE ad AtUVJ.TM,—. <br />
The URL can be used to link to this page
Your browser does not support the video tag.