Laserfiche WebLink
DC Memo <br /> SA-92-72 <br /> February 4 , 1993 <br /> Page 3 <br /> h. Submit an Improvement Plan prepared by a registered Civil <br /> Engineer, showing drainage, driveway access details, on-site <br /> parking, existing and proposed utility services, and grading. <br /> Storm drainage run-off shall be retained on-site. The <br /> drainage pattern and corresponding storm drain improvements <br /> shall be shown on the Improvement Plan. Pond capacity <br /> calculations shall be submitted for approval. A plan check <br /> fee will be required. (Development Title Section 9-884) <br /> CM/drh <br /> c: Margie and Andy Whiteley <br /> SA9272DC.CTM <br />