Laserfiche WebLink
APPLICATION- GRADING EXCAVATION <br /> SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> :•;�. ��y., '•' ;..�<.}�}::�>:.:}•.>:..�. , } <br /> BUILDINGS AND STRUCTURES �,.:. fi.�;:.>:,::<,:�;�.�.>�::>..>•: <br /> :,.::.{.:.. ;:.: > ',:{•:.:::>,•::. anon may be shown on the Site Plan) <br /> Structure Number Proposed Use •' Ground Floor Area Highest Floor Overall Hee�ight On <br /> • The 'structure number' should be used In Identifying the structure on the Site Plan. <br /> •• If there are two or more proposed uses in a building, make separate listings for each use. For residential buildings, state <br /> the number of units in each structure. <br /> Domestic Watai <br /> Public Water Service Provider Annex-Formation Distance to Public <br /> Proposed ❑ Required Water (Feet) <br /> Existing O <br /> Private Water❑ Existing Weil O New Well ❑ Well Replacement O <br /> Sewage Disposal <br /> j�/A <br /> Public Sewage Service Provider Annex-Formation Distance to Public <br /> Disposal Required Sewer Facility <br /> Proposed ❑ <br /> Existing O <br /> On-site Sewage Existing Septic System O New Septic System ❑ Other ❑ <br /> Disposal O <br /> Storm Drainage <br /> Public Storm Service Provider (N Public) Annex-Formation Terminal Drainage Retention Ponds <br /> Drainage Required to: <br /> Proposed ❑ <br /> Existing O <br /> Private Storm On-site Retention Pond(s) O Natural Drainage/No Change EX Other O <br /> Drainage 2 <br /> Exist I n g Roads <br /> Road/Street Name R.O.W. Width Pavement Width Curb/Gutter Sidewalks <br /> STATE HIGHWAY 120 60 ' TOTAL 40 ' TOTAL Yes O No Yes O No <br /> Ek <br /> Yes O No O Yes❑ No O <br /> Yes O No O Yes ❑ No ❑ <br /> Excavation Characteristics <br /> Excavation Area (Acres): 14 . 4± ACRE Fill Area (Acres): 5 . 7t ACRE <br /> Existing Site Elevation (Average at 100' Intervals): 64 . 9 <br /> Proposed Site Elevation (Average at 100' Intervals): 6 3 . 9 <br /> Perimeter Elevation (Average at 100' Intervals, 5• from Property Line): 6 3 , 9 <br /> Perimeter Elevation (Average at 100' Intervals, 100' from Property Line): 6 3 . 9 <br /> Amount of Material to be Removed (Cubic Yards): 24 , 592 CUBIC YARDS <br /> WHEN 3 17 N IS Approximate End Date: SEPTEMBER 1993 <br /> Approximate Start Date: APPROVED <br /> Hours of Op ration: 6 : 00 AM TO 6 : 00 PM Average Daiy Truck Trips FOUR <br /> -3- <br />