My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
ACACIA
>
525
>
2800 - Aboveground Petroleum Storage Program
>
PR0526379
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2020 1:59:24 PM
Creation date
6/2/2020 3:00:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0526379
PE
2832
FACILITY_ID
FA0002864
FACILITY_NAME
DAMERON HOSPITAL
STREET_NUMBER
525
Direction
W
STREET_NAME
ACACIA
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13715304
CURRENT_STATUS
01
SITE_LOCATION
525 W ACACIA ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Is the primary tank free of water or has another preventative measure been taken? <br /> 4 NOTE: Refer to paragraphs 6.10 and 6.11 of the standard for alternatives for Category 1 ❑ Yes ❑ No ❑ N/A <br /> tanks. N/A is only appropriate for these alternatives. <br /> 5 For double-wall or double bottom tanks or CE-ASTs, is interstitial monitoring equipment ❑ Yes ❑ No ❑ N/A <br /> (where applicable) in good working condition? <br /> 6 For double-wall tanks or double bottom tanks or CE-ASTs, is interstice free of liquid? Yes ii No ii N/A <br /> Remove the liquid if it is found. If tank product is found,investigate possible leak. <br /> Equipment on tank <br /> 7 If overfill equipment has a"test'button, does it activate the audible horn or light ❑ Yes ❑ No Li N/A <br /> to confirm operation? If battery operated, replace battery if needed. <br /> 8 Is overfill prevention equipment in good working condition?If it is equipped with a ❑ Yes ❑ No ❑ N/A <br /> mechanical test mechanism,actuate the mechanism to confirm operation. <br /> 9 Is the spill container(spill bucket)empty,free of visible leaks and in good working ❑ Yes ❑ No ❑ N/A <br /> condition? <br /> 10 Are piping connections to the tank(valves,fittings, pumps,etc.)free of visible leaks? ❑ Yes ❑ No <br /> Note:If"No", identify location and describe leak. <br /> 11 Do the ladders/platforms/walkways appear to be secure with no sign of severe corrosion ❑ Yes ❑ No ❑ N/A <br /> or damage? <br /> Containment(Diking/Impounding) <br /> 12 Is the containment free of excess liquid,debris,cracks,corrosion,erosion,fire hazards and ❑ Yes ❑ No ❑ N/A <br /> other integrity issues? <br /> 13 Are dike drain valves closed and in good working condition? ❑ Yes ❑ No ❑ N/A <br /> 14 Are containment egress pathways clear and any gates/doors operable? ❑ Yes ❑ No ❑ N/A <br /> Concrete Exterior AST(CE-AST) <br /> 15 Inspect all sides for cracks in concrete. Are there any cracks in the concrete exterior larger ❑ Yes ❑ No ❑ N/A <br /> than 1/16"? <br /> 16 Inspect concrete exterior body of the tank for cleanliness, need of coating,or rusting where ❑ Yes ❑ No ❑ N/A <br /> applicable. Tank exterior in acceptable condition? <br /> Visual inspect all tank top openings including nipples, manways,tank top overfill containers, <br /> 17 and leak detection tubes. Is the sealant between all tank top openings and concrete intact ❑ Yes ❑ No ❑ N/A <br /> and in good condition? <br /> Other Conditions <br /> 18 Is the system free of any other conditions that need to be addressed for ❑ Yes ❑ No <br /> continued safe operation? <br /> Monthly Checklist Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.