Laserfiche WebLink
ll . 'Please include a copy of any studies (soils , geology, marketing , <br /> etc . ) that you may have had prepared for this project or project <br /> site. <br /> See Attached. <br /> C . PROJECT CHARACTERISTICS <br /> 1 . Services : Indicate how the following services will be provided <br /> for your project and availability of service . <br /> a . Water Supply : Connection to Raymus Village. <br /> b. Sewage Disposal : On site septic tank system and leach field. <br /> C . Storm Drainage : On site retention pond. <br /> If an extension of any of the above is necessary, indicate <br /> which service( s ) , what agency will be providing the <br /> sclvice( s ) , and the distance of the extension( s ) : <br /> Raymus Village Maintenance District - Water. <br /> d. Natural Gas : P.G. & E. service to site <br /> e. Electricity : P.G. & E. service to site' <br /> f . Road/Access ( i .e . , paved, unpa, ed, public/private, road name ) : <br /> Northland Road is an existing 2 land paved public road directly to the North <br /> g . Fire: Manteca 7LatropDi s ta nce to nearest fire station: 1 3/4 miles <br /> h. Schools : Manteca Unified School District <br /> i . Telephone- <br /> 2 . Describe any site alterations which result from the proposed pro- <br /> ject (specifically address the amount and location of grading, <br /> cuts and fills, vegetation removal , alterations to drainage, <br /> removal of existing structures , number of trees removed, etc . ) . <br /> A large proportion of the almond trees will be removed. The existing home and <br /> barn will be removed. Site will be graded to provide adequate drainage away <br /> from building and facilitate required retention of storm water. <br /> 3 . Air Quality Information: <br /> Number and type of vehicles associated with completed project <br /> Phase I approximately 153-200 Vehicles on every Sunday and vaious lesser amounts on <br /> certain weeknights. Phase II, an additional 100 to 150 vehicles on the same schedule. <br /> Types of emissions and sources associated with project None <br /> Fuel sources (and amounts ) to be consumed by or as a result of the <br /> completed project Natural gas for heating. Total load 1,048,000 BTU. <br /> Will the project result in substantial air emissions or deteriora- <br /> tion of ambient air quality? X NO YES <br /> 4 . How much agricultural land will be removed from production? <br /> Approximately 10 acres of almonds <br /> Irrigated x Not irrigated <br /> Use Permit Application - 9 - ( 1/89 ) <br /> if aavmoeo II <br />