Laserfiche WebLink
22 <br /> # 5 Rebar on 2` centers1 both directions <br /> DEP t J rvl 3� <br /> 8 � <br /> A <br /> 18� <br /> Heyy,���s� 12 Concrete <br /> � <br /> � s <br /> PLAN VIEW - <br /> 11 1 24' Sand <br /> 1 = 10 <br /> Concrete slab 6" thick <br /> 10�� <br /> 80� A- <br /> 12 <br /> —I <br /> .f SB-B ' Concrete <br /> wads 18 high 8 Length Concrete9 � <br /> Vert. 1 5 <br /> Horiz 11' 1,0 <br /> CLOSE UP OF WALL <br /> Vapor collection 1 .511PVC Pipe <br /> # 5 Rebar on 2� centers in 6"concrete slab <br /> Jx <br /> JL Li <br /> A� <br /> i Moisture collection 1 .5 PV Pipe <br /> 100 <br /> I � <br /> SIDE VIEW 1 Vapor collection 1 .511PVC Pipe B <br /> Vert. 111 51 S nd <br /> Ground line 7ZGround line <br /> Horiz. 1 =10f I <br /> Sand <br /> Compacted soil El Compacted soil <br /> Ground line Lj L <br /> /V Collection sump 13 <br /> llti � <br /> Moisture collection <br /> Polypropylene liner between sand and compacted soil 1 .5 11 <br /> PVC Pipe Polypropylene liner between sand and compacted soil <br /> SECTION A-A <br /> Vert. 1'15' <br /> Horiz 1= 10 <br />